Project Fact Sheet

NIGHT WIND

Grid Architecture for Wind Power Production with Energy Storage through load shifting in Refrigerated Warehouses

Action Line: SUSTDEV-1.2.3 New technologies for energy carriers - Electricity

Coordinator
Contact Person:
Name: VAN DER SLUIS, Sietze M. (M.Sc.)
Tel: +31-555493162
Fax: +31-555493740
Email: Contact
Organisation:
NEDERLANDSE ORGANISATIE VOOR TOEGEPAST NATUURWETENSCHAPPELIJK ONDERZOEK - TNO
TNO BUILT ENVIRONMENT AND GEOSCIENCES, REFRIGERATION AND HEATING TECHNOLOGY
Schoemakerstraat 97
NETHERLANDS

The Night Wind project proposes to design grid architectures for Wind Power Production combined with Energy Storage means of load management of Refrigerated Warehouses (Cold Stores). Distributed Renewable Energy Resources have a large potential for Energy supply in Europe with hindsight on reduction of CO2 emissions.

However, renewables like Wind and Solar energy are difficult to integrate due to their intermittent contribution. Refrigerated Warehouses are constant power users, day and night. Electricity is converted by the refrigeration installation into thermal energy in refrigerated or frozen products. When the temperature of stored frozen products in the EU is allowed to vary by 1 degree Celcius, the warehouses can act as a 50.000MWh battery on the grid i.e. store over twice the projected 2010 EU average hourly wind power production.

Balancing the wind power production with fossil fuel generation systems can lead to inefficient operation of those plants, balancing the wind power production with refrigerated warehouse load management promises to be a clean and cost effective method. For warehouse owners, it has the potential to lower operational (energy) costs.

The Night Wind project will address the topics necessary to assess this option for demand side management:
- potential, economic and trade aspects of Wind Power DER + Cold Store DSM
- design and modelling infrastructures for island operation of Wind Energy + Cold Store DSM
- control concepts and algorithms for Wind Energy + Cold Store DSM grid integration
- quality preservation of frozen products during minor temperature fluctuations
- legal issues
- demonstration and introduction outline plan

The project will conclude with a demonstration phase for islanded operation, on an existing (Dutch) cold store owned by one of the project partners. The Night Wind project is a medium term solution, a forerunner of long-term hydrogen storage.

Project details
Project Reference: 20045 Contract Type: Specific Targeted Research Project
Start Date: 2006-07-01 End Date: 2008-06-30
Duration: 24 months Project Status: Completed
Project Cost: 1.35 million euro Project Funding: 717600.00 euro

 

Participant Organization: TEHNICE UNIVERSITET SOFIA. Country: BULGARIA
Participant Organization: FUNDACION CENER-CIEMAT Country: SPAIN
Participant Organization: PARTNER LOGISTICS BERGEN OP ZOOM B.V. Country: NETHERLANDS
Participant Organization: VERENIGING VAN NEDERLANDSE KOEL- EN VRIESHUIZEN Country: NETHERLANDS
Participant Organization: ESSENT ENERGY TRADING B.V. Country: NETHERLANDS
Participant Organization: FORSKNINGSCENTER RISOE Country: DENMARK

RCN: 79800
Last updated: 2009-12-21 17:08:46.0

Go back -

CORDIS RTD-PROJECTS / © European Communities.


What is FP6? : FP6 step by step : Find a Call : Get Support : Find a Partner : Find a Document : Prepare & submit a proposal - EPSS : Project management : Find a Project : What's New?
Go topCORDIS HomeAboutCORDIS Help DeskFAQCopyrightPublications Office
 
FP6 at a glance Activity Areas Instruments Budget Essential documents CORDIS Home