|
|
|
|
|
What's New |
|
Site Map |
|
|
|
|
|
Frequently Asked Questions of the ELECTRA Spreadsheets
Version 21 August 2001 The FAQs for ELECTRA version 1.3 is still available
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 35. |
When I reduce the value of an AC partners costs by 5000 euro, more than this is subtracted from the total This is because the total figures on the 8.3 form contain all elements of the costs including the Fixed overhead element which also decreases when the direct costs decrease. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 34. |
I have different results after importing from 1.31 One possibility is that an old version with some minor mathematical errors has been corrected or - more commonly the orange cells have been overwritten by a formula instead of fixed values. In this case ELECTRA cannot detect the difference between a correct and an incorrect formula and so ignores the new one and leaves the original in place. These need to be replaced by the fixed value in the original or the formula in the new ELECTRA. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 33. |
Outdated |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 32. |
Outdated |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 31. |
I still keep getting requests to make missing links on my master sheets - these are very time consuming. You may safely ignore these and answer 'NO' each time. (see 18) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 30. |
I deleted some green cells and now have errors on the brown cells NEVER delete cells only clear them. Go back to your previous version and repeat any changes made (Hint: save as 'new version' often) |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 29. |
I get strange results when I enter a percentage figure into ELECTRA (eg 20%) Never include the '%' sign in any entry as Excel divides the number by 100 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 28. |
I get confusing warnings when entering data on the Coordintators A7 forms. Please ensure you fill in the basic data concerning funding on the 8.1 and 8.2 forms first |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 27. |
How do I have different percentages for EU contributions in different years? Select 'variable' on 8.3 percentage field and enter the pecentage figure you wish under each year |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 26. |
Outdated |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 25. |
Outdated |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 24. |
Outdated |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 23. |
When I print out the forms I cannot read the numbers in the shaded boxes Make sure that, if you are using a black and white printer, it is set to print in Greyscale. If it prints in Black and white only, depending on the printer there might be a problem. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 22. |
Outdated |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 21. |
Outdated |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 20. |
Outdated
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 19. |
When I try to start ELECTRA the system fails to run, or I get various virus alerts, what is wrong? This can be because you are not running NT4.0/W98/W95 with Office 97 and associated Visual Basic installed. Your system manager may have configured your systems to not allow visual basic macros to run as part of a virus protection scheme. A stand alone computer with the above configuration should solve your problem. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 18. |
After exporting and importing partners spreadsheets I have residual external links left on the main 'co-ordinator's' ELECTRA work book. How can I remove them? This replaces FAQ 9 - Any stray external links that are left can be removed by answering 'Yes' to the request to remake links when you load your main 'co-ordinator's' workbook and selecting the same source file as your main 'co-ordinator's' workbook. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 17. |
The A3.1 form - Number of Person Months - does not reflect the number of person months attributed to permanent staff in the case of AC funded partners. Is this correct? The spreadsheets are correct, the permanent staff person months should NOT appear on the A3.1 - Number of person/months, they should only appear on the the work package resources. They are deliberately left out of the costing forms as no cost is attributed to them. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 16. |
When I want to remove a partner, the system doesn't allow me to remove the lines in A3, A4 & A5? Correct, the system will do this automatically. However you must clear the Partner ID entry in the green field in A3.1 for this to take effect. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 15. |
Outdated
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 14. |
Outdated
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 13. | Outdated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 12. |
Are there versions of ELECTRA available for other contract types?
Yes, see the ELECTRA home page. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 11. |
I am a partner and received my sheets 8.1 - 8.4. Unfortunately after filling them in I find I need an extension form - How do I add it without losing my data?.
Send your completed Workbook to your coordinator who will import the work you have done. They will create the extension forms you need and re export them with your old forms. You can then complete the extensions without losing the data you have already entered. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 10. | Outdated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 9. |
Outdated
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 8. |
Outdated
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 7. |
Outdated
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 6. | Outdated | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 5. |
Where does it calculate overheads for the AC (Additional Costs) case?
This is only done on the A3.2 form. The overheads on the 8.2 form should remain zero |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 4. |
Can I have the password for the sheets or programme?
No - sorry but the integrity of the worksheets must be maintained so that we can use the data for subsequent processing. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 3. |
Can I have the password for the workbook?
Yes - it is null(nothing), you only have to select unprotect for it to happen. PLEASE do not edit the names of the spreadsheets, this will have undefined effects. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 2. |
Outdated
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| 1. |
Which version should I be using?
ELECTRA 2000 should only be used for projects from the second call onward that are now starting to be negotiated. You can import files that may have already been created with Electra version 1.31. into ELECTRA 2000. However, for amendments to existing contracts from the first call, you should continue to use Electra 1.31. If you need a new copy of Electra 1.31 see your Project Officer. |
ELECTRA Latest Versions and Upgrades
|
|
|
|
|