Objective
Our Idea is to develop a computer controlled, advanced, profile spray quench, heat extraction system with advanced cooling rate control, closed loop thermal and dimensional control and integrated high grade heat recovery & re-use. We aim to recover 50% of the energy wasted at the profile cooling stage (for re-use in the energy intensive heat-ageing process), and simultaneously reduce scrap produced at the profile cooling stage by 25%. This would mean a saving of 1.9 million kWh of energy per line, and an increase in revenue of around € 1.3 million per line, almost trebling profit (through scrap turned into saleable product & reduction in energy used). The benefit to the environment is also substantial, with a reduction of 474Te of CO2 emissions per line
Programme(s)
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Topic(s)
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Call for proposal
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
FP7-SME-2011
See other projects for this call
Funding Scheme
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Coordinator
LE13 0PB MELTON MOWBRAY
United Kingdom
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.