Objective
Systems for Green Operation (SGO) WP1 will deliver a V&V Plan on how European industry can support and de-risk Airbus in their work in SGO WP4 on a comprehensive ground demonstration ahead of a flight demo. This de-risk and support will also include inputs from SGO WP2.3 on Technology Adaptation.
ELPOC will directly support Airbus in SGO WP4.2 Ground Demonstration.SPUK will make extensive use of technology development hardware, engineering capabilities and facilities from previous R&T projects, principally EU MOET, UK AMES.
SPUK will work with Airbus throughout ELPOC’s planned 51 months duration. In its initial stages the project will have a Preliminary Design Review (PDR) addressing the Architecture Options available (power system 230VAC VF, +/-270VDC – generation, conversion, useage; emulation of major electrical loads including a programmable inertia rig for engine start and icing protection technologies).
SPUK will set up a basic emulation of an aircraft essential power buss, and use this as an environment to conduct a series of specific trade off studies in key power electronic control technologies – to progress the Airbus activity on top level power system optimisation for a complete aircraft. The PDR will determine a definitive list of these key electronic technologies. SPUK is proposing: Power Density (kW/kg); Efficiency; Switching Strategy; Control Strategies; Topology of Transistor/Diode Options; Forced Air Cooling (deletion of liquid circuit).
Fields of science (EuroSciVoc)
CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.
CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: https://op.europa.eu/en/web/eu-vocabularies/euroscivoc.
- engineering and technology mechanical engineering vehicle engineering aerospace engineering aircraft
- natural sciences mathematics pure mathematics topology
You need to log in or register to use this function
We are sorry... an unexpected error occurred during execution.
You need to be authenticated. Your session might have expired.
Thank you for your feedback. You will soon receive an email to confirm the submission. If you have selected to be notified about the reporting status, you will also be contacted when the reporting status will change.
Programme(s)
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Topic(s)
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Call for proposal
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
SP1-JTI-CS-2009-02
See other projects for this call
Funding Scheme
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Coordinator
LU7 9GT Pitstone Green Buckinghamshire
United Kingdom
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.