Objective
"Conventional perforate acoustic liners are presently used in hot areas of aero-engines. However, current liner technology regarding linear liners for engine intakes (“cold stream”) does not meet the thermal and other functional requirements valid for engine exhaust areas (“hot stream”). It has however been shown, that a liner top sheet assembly consisting of a layer of metallic foam in combination with perforate, shows acoustic characteristics that are nearly independent of both flow and temperature. The objective of this proposal is to integrate such an acoustic absorber into the TEC structure to demonstrate the performance in a relevant environment. This technology will enable the extension of the acoustically treated area to strongly reduce the noise radiation from the core duct (""hot stream"")."
Programme(s)
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Multi-annual funding programmes that define the EU’s priorities for research and innovation.
Topic(s)
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.
Call for proposal
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.
SP1-JTI-CS-2011-03
See other projects for this call
Funding Scheme
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.
Coordinator
582 78 LINKOPING
Sweden
The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.