Obiettivo IN THIS PROJECT A DESIGN WAS TO BE MADE FOR AN INDUSTRIAL ABSORPTION HEAT PUMP OF 300 KW WITH LIBR/H2O AS A WORKING FLUID PAIR. THE DESIGN OF THE ABSORBER WAS BELIEVED TO BE THE MOST DIFFICULT PROBLEM AND A SPECIAL ABSORBER TEST RIG HAS BEEN BUILT. A SCALED DOWN 10 KW MODEL HAS BEEN BUILT TO GAIN EXPERIENCE. THIS HEAT PUMP TRANSFORMED HEAT OF 20 - 25 DEGREES C INTO HEAT OF 60 - 90 DEGREES C. TO AVOID CRYSTALLIZATION DURING PERIODS OF NON-OPERATION THE LIBR IS STORED AT A CONCENTRATION LESS THAN 59 %. THE SEALING OF THE ABSORBER IS A MAJOR PROBLEM DUE TO THE LOW PRESSURE INSIDE. Programma(i) PRE-ENNONUC 2C - Energy research and development programme (EEC), 1979-1983 Argomento(i) Data not available Invito a presentare proposte Data not available Meccanismo di finanziamento Data not available Coordinatore NEI International Research and Development Company Ltd Contributo UE Nessun dato Indirizzo Fossway NE6 2YD Newcastle upon Tyne Regno Unito Mostra sulla mappa Costo totale Nessun dato