ENERGY SAVINGS IN MUNICIPAL BUILDINGS IN WARRINGTON (UK) AND DUISBURG (D)

Objetivo

A) to secure the benefits of technical cooperation and communication between leading local authorities in two countries in the matter of energy savings in local authority buildings.
B) to test improved methods, products and techniques in actual practice recording all costs and difficulties and monitoring actual performance of the completed building conversions during a subsequent heating season.
C) to accelerate the adoption of energy saving measures in municipal buildings in other EEC Member States.
D) to accelerate the unification of markets for products (and services).
E) to accelerate industrial innovation.
Aims A and B were fully achieved. A modest contribution was made towards aims C, D and E.
Annual Energy Saving
Expected Actual
Warrington 522 GJ 510 GJ
Duisburg 592,000 kWh 715,600 kWh
The project was managed by International Urban Technology Exchange Program LTD (IUTEP), London, UK, as a leader, together with two local authorities : Cheshire County Council (UK) and Duisburg (Germany). Another Municipality (Enschede, NL) withdrew from the project before signing the contract. Bologne (Italy) withdrew after signing the contract due to a lack of local financing. Stage 1:
mutual review of feasibility studies from the 3 towns. Possible revision of own feasibility study. This stage covered matters such as functional needs, design methods, products availability, prices performances quality, workmanship and quality of design.
Stage 2:
implementation of energy saving measures in one building in each of the 2 towns:
a school (Duisburg) and a Cheshire County Council office building (in Warrington). Co-operation on common methodology for data collection and analysis.
Stage 3:
the 2 projects were monitored for one heating season in order to evaluate the actual efficiency ofenergy saving measures. Operation and maintenance costs are also recorded. Public relations activities were carried out not only in the 2 countries involved but also in the other EEC Member States.

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

Int Urban Technology Exchange Programme Ltd (IUTEP)
Aportación de la UE
Sin datos
Dirección
Lower Westcott Farm
TQ13 8SU Moretonhampstead
Reino Unido

Ver en el mapa

Coste total
Sin datos