GENERAL STUDY AND FIELD TESTING OF DEEP WATER SUBMARINE PIPELINE

Objectif

The scope of the project was the study and field testing of the laying of pipelines in deep waters.

The project was constitued by the definition and the development of technology to be followed in order to achieve pipe laying capability in water depths up to 1 000 m, with pipe sizes ranging from 6" to 48".

Thème(s)

Data not available

Appel à propositions

Data not available

Régime de financement

Data not available

Coordinateur

Tecnomare SpA - Società per lo sviluppo delle tecnologie marine
Contribution de l’UE
Aucune donnée
Adresse
SAN MARCO 3584
30124 Venezia
Italie

Voir sur la carte

Coût total
Aucune donnée