Objectif Development of a monitoring system for remote subsea oil wellheads.The work is divided into the following phases:Phase 1: sensor development and testingPhase 2: total system development and operational testing.Work commenced March 1980 and competitive bids were obtained for phase 1 of the project. A contract was awarded to TRW Ferranti Subsea Ltd, to cover development of:1) valve position sensor2) through flowline train sensor3) pressure transducer4) temperature transducerThe development and testing of sensors has been successful.As part of the project, a survey was carried out by Westcott and Butt (Imperial College, University of London), where the development of a new standard for subsea interfacing is proposed.The project involves the development of a system for monitoring multi-plexing and transmitting data, derived from a number of sensors, mounted on a subsea production wellhead, where diver intervention is not possible. Programme(s) ENG-HYDROCARB 1C - Programme (EEC) of Community projects in the hydrocarbons sector, 1973-1985 Thème(s) 1.9 - PRODUCTION SYSTEMS Appel à propositions Data not available Régime de financement DEM - Demonstration contracts Coordinateur British Petroleum plc (BP) Contribution de l’UE Aucune donnée Adresse Britannic House Moor Lane EC24 9BU London Royaume-Uni Voir sur la carte Coût total Aucune donnée