CONNECTION OF UNDERWATER SYSTEMS OF PIPELINES/FLOWLINES

Objetivo

The objective of the project was to undertake engineering design and detail of a simplified diverless, modular flowline pull-in and connection system which can be universally applied to a variety of subsea oil and/or gas production scenarios.
The aim was to use a fresh approach by generating new concepts, which allowed for a modularised system to be developed around the basic concepts conceived. By this method it was possible to design a system having a universal application which will suit various combinations of subsea installations, including single, multiple and bundled flowline/pipeline applications.
The CUSP project was successful in producing an innovative, efficient design of a system with the following advantages:
- Flowline alignment is achieved through a single continuous operation thus minimising complex mechanisation.
- Structural clamping is achieved as a separate function from sealing. (The seal being the possible weakness in any connector).
- Flowline engagement is achieved through direct tension eliminating friction effects.
- Cellular design has ensured all possible combinations are considered ie, bunded, single or multiple flowlines. The cellular concept offers simultaneous connection of multiple lines.
- The aims of universal design also address control lines whether they be hydraulic or electrical.
- Installation tooling is innovative but simplistic due to careful interface design. Hydraulic actuators are utilised thus enabling a robust, efficient diverless installation and retrieval sequence.
- Pipework from Xmas trees, manifolds, etc, can be readily aligned to the pulled in pipe/flowlines by a unique unit which has no moving parts and is permanently fitted to the associated support framework.
- Lightweight delivery system which allows for various methods of installation and retrieval using conventional ROVs, etc.
- A new and innovative connector which has many potential subsea applications.
- Guidelineless, diverless installations.
The project addressed the engineering design of the complete system from concepts through to a fully specified prototype package for manufacture and testing. The overall system breaks down into four sub-sections :
a. Pipe Alignment and Lockdown Structure
b. Universal delivery and guidance system for the tooling packages
c. Flowline pull-in equipment
d. Telescopic Connector and operating equipment.
Full detailed engineering drawings were produced, including system GA's, component assemblies and details.

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

Alpha Thames Engineering Ltd
Aportación de la UE
Sin datos
Dirección
Essex House Station Road
RM14 2SU Upminster
Reino Unido

Ver en el mapa

Coste total
Sin datos