Objective The objective of the Subsea Tree with Remote Intervention (STRI) project is to achieve the acceptance of remote intervention within subsea production eauipment design. This will be achieved by the development of a fully maintainable subsea production tree.The tree will be suitable for intervention by ROV based maintenance systems throughout the production life of a well. The design must allow low cost field development and reduced operating costs.The tree will be designed in accordance with specified principles for intervention. The results will be confirmed by installing and testing the tree on a North Sea production well. The detailed specification and design of the tree will be in accordance with the requirements of a sponsoring oil company.No details about the results pertaining to the project are available. No work has yet been undertaken.A subsea installation and its intervention system comprise three main assemblies, the Subsea Production Tree, an ROV Toolskid and a Remotely Operated Tool. The last two items are currently being developed under the IISSPE project currently being undertaken by SISL. The Subsea Production Tree is the subject of this project and will have the following major design requirements.10000psi, 5-1/8" x 2-1/16" dual bore tree presenting a worst case for component level intervention.Complex arrangement with control valves having defined tree positions and selected as required by the application.Standard tree components to allow early commercial use of the tree whilst minimising tree development risks.Satellite tree suitable for production, gas lift and injection configurations and template or manifold applications.Minimal subsea equipment hardwqre specifications, utilising ROV Intervention as the primary back-up.Vertical lift of heavy, replaceable components from upper tree face locations.Clear access at two opposits tree faces for ROV intervention.The project comprises several distinct phases.1000 Project ManagementAdministration and control of the project.2000 Detail DesignDetail desing of all tree components and assemblies.3000 ManufactureSupply of materials, labour and facilities for the manufacture of the tree.4000 UnitisationAssembly, fitting and preparation of completed tree.5000 Intervention IntegrationOnshore site testing of intervention system and intervention functions.6000 Field InstallationInstallation of tree on offshore wellhead.7000 Subsea TestingPerformance of all subsea intervention tasks on installed production tree.8000 First Year InterventionPerformance of limited intervention tests.9000 Second Year InterventionPerformance of limited intervention tests. Programme(s) ENG-HYDROCARB 2C - Programme (EEC) of support for technological development in the hydrocarbons sector, 1986-1989 Topic(s) 1.9 - PRODUCTION SYSTEMS Call for proposal Data not available Funding Scheme DEM - Demonstration contracts Coordinator Subsea Intervention Systems Ltd EU contribution No data Address Bucksburn House Howes Road Bucksburn AB2 9RQ Aberdeen United Kingdom See on map Total cost No data