Cel To modify an existing furnace for experiments on replacement of the fuel-oil with blast furnace gas and oxygen enriched combustion air.This project was stopped because the important expected sale of coke-oven gas to the chemical industry was not realized. The state of advancement of this program at the contract cancellation date was as following :- the studies on the furnaces modifications were realized.- the burners were modified to work either with low enriched blast furnace gas and oxygen enriched combustion air to a rate of 40 %, or with rich gas and atmospheric air.The heavy plate mill is equipped with 2 pusher furnaces :- A 110 T/H furnace with 3 reheating zones- A 180 T/H furnace with 5 reheating zonesFor this experiment the 110 T/H furnace only will be modified. To allow this furnace to work with low up-graded gas and oxygen enriched combustion air, it is necessary to increase the dimension of the gas feeding pipes, to modify the burners and to build a new oxygen network to feed each burner with oxygen. To protect the waste gas circuit and the recuperator, a new protection system is also foreseen. Program(-y) ENG-ENALT 2C - Programme (EEC) of demonstration projects relating to the exploitation of alternative energy sources and to energy saving and the substitution of hydrocarbons, 1983-1985 Temat(-y) 3.2 - INDUSTRY Zaproszenie do składania wniosków Data not available System finansowania DEM - Demonstration contracts Koordynator SOLLAC DUNKERQUE Wkład UE Brak danych Adres RUE DU COMTE JEAN B.P. 2508 59381 DUNKERQUE Francja Zobacz na mapie Koszt całkowity Brak danych