HYDRO-ELECTRIC POWER GENERATION FROM A WATER IRRIGATION SYSTEM

Objetivo

To derive electric power from an existing water irrigation network. The anticipated annual energy output is 2,850,000 kWh.
Since 1990 when it was in order to work, the hydroelectric power station did not work because of two combined events :

- First, several periods of dryness especially in 1990 and 1992 kept out of work.

- Then, damages resulted from exceptional swellings of the river.

Now in good working order again but the dryness still does not permit to work.
An existing irrigation system is supplied from a dam at l'Ospedale, with the water level being topped up from the Asinao River, via a 400 mmm diameter pipe. To extract energy from this flow of irrigation water, a hydroelectric power station was installed at suitable site along the pipe.
The project includes the civil construction of the power station and the supply and installation of a turbine generating set, power factor correction capacitors, transmission transfomers, control and protection equipment.
Technical Data :
Turbine : Type 2 jets - Pelton
Head 326 m (gross), 262 (nett)
Flow 0.3 m3/s
Speed 1000 rev/min
Output 671 kW mechanical
Generator : Type Asynchronous
Rating 644 kW at 0.85 p. f.
Voltage 380 V
Transformers : Voltage 380/20KV
General : The electricity is to be fed to the EDF National Grid.
The Total Unit Cost is 0.44 FF/kWh.

Tema(s)

Data not available

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

Office d'Équipement Hydraulique de la Corse
Aportación de la UE
Sin datos
Dirección
Avenue Paul Giacobbi
20601 Bastia
Francia

Ver en el mapa

Coste total
Sin datos