Obiettivo It is intended to install three small Pelton turbines in an existing drinking water supply conveyance system to replace the installed breakpressure tanks and to generate electricity.The turbines are of the vertical axis type and provided with asynchronous generators feeding via a step-up transformer into the public grid. All three turbines are to be controlled by micro-processors and remotely monitored by a solar/wind powered central computer. The total energy produced per year is 449,280 kWh and the estimated payback is 4 years.Vertical axis, impulse turbines will be installed, one at each of three break pressure tanks in an existing water supply system. The turbines will all drive aynchronous generators which will be connected via step-up transformers to a 10 kV overhead line for connection to the local grid. All the turbines will be controlled and monitored by individual microprocessors which will automatically download data via a telephone line to a central computer. Site 1 Site 2 Site 3Net head 45 m 62 m 55 mFlow 55 l/s 55 l/s 55 l/sOutput Power 15 kW 20 kW 18 kW Programma(i) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Argomento(i) Data not available Invito a presentare proposte Data not available Meccanismo di finanziamento DEM - Demonstration contracts Coordinatore MC GILLYCUDDY EUGENE F. Contributo UE Nessun dato Indirizzo TINEHALLE CO KERRY MILLTOWN Irlanda Mostra sulla mappa Costo totale Nessun dato