New building methodology for improved full-concrete wind towers for wind turbines.

Objective

Building methodology in skyscrapers marked a turning point in the construction sector. Due to the high altitude of those buildings, the only way of building them is a crane that rises in the same manner the skyscraper does.
The main objective of the AIRCRANE project is to complete, qualify, standard setting and demonstrate in real working conditions a self-climbing telescopic crane (AIRCRANE) for the construction of full-concrete towers for wind turbines, at very low cost compared to current market solutions. This new solution has been inspired by the skyscraper’s building methodology.
As a consequence of the development of this new crane, the second objective will be the introduction in the market of a new full-concrete tower with no height limit and with a new patented procedure of building that will bring reliability, time saving, quality and workers safety.
In the current decade the main trend in the wind energy sector is to decrease the costs of the energy produced by wind turbines. One of the main strategies is the installation of the rotor axis (as well as nacelle and generator) at higher heights, as much as possible, where turbulences are minor and the efficiency of the equipment is higher. However, the wind industry has found some technical and economic constraints given by the construction of steel towers. This constraints are related to: size limitations in transport (larger diameters of tower segments), cost increase for heights greater than 100m., vibrations, etc..
Full concrete towers, built with precast concrete elements are a feasible solution: easy to transport, more durable (~50 years vs. ~25 years of steel), less vibrant, less required maintenance, etc. Another advantage is that concrete annual average price is significantly lower than steel.
The development of the new AIRCRANE will help in the construction of full concrete towers, to reach heights unreachable with conventional nowadays crawler cranes (>140m) and at a much lower cost.

Fields of science (EuroSciVoc)

CORDIS classifies projects with EuroSciVoc, a multilingual taxonomy of fields of science, through a semi-automatic process based on NLP techniques. See: The European Science Vocabulary.

You need to log in or register to use this function

Programme(s)

Multi-annual funding programmes that define the EU’s priorities for research and innovation.

Topic(s)

Calls for proposals are divided into topics. A topic defines a specific subject or area for which applicants can submit proposals. The description of a topic comprises its specific scope and the expected impact of the funded project.

Funding Scheme

Funding scheme (or “Type of Action”) inside a programme with common features. It specifies: the scope of what is funded; the reimbursement rate; specific evaluation criteria to qualify for funding; and the use of simplified forms of costs like lump sums.

SME-1 - SME instrument phase 1

See all projects funded under this funding scheme

Call for proposal

Procedure for inviting applicants to submit project proposals, with the aim of receiving EU funding.

(opens in new window) H2020-SMEInst-2014-2015

See all projects funded under this call

Coordinator

STRUCTURAL RESEARCH, S.L.
Net EU contribution

Net EU financial contribution. The sum of money that the participant receives, deducted by the EU contribution to its linked third party. It considers the distribution of the EU financial contribution between direct beneficiaries of the project and other types of participants, like third-party participants.

€ 50 000,00
Address
AV PIRINEOS 11 1 D
22004 HUESCA
Spain

See on map

SME

The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.

Yes
Region
Noreste Aragón Huesca
Activity type
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Links
Total cost

The total costs incurred by this organisation to participate in the project, including direct and indirect costs. This amount is a subset of the overall project budget.

€ 71 429,00