Skip to main content
European Commission logo print header

ENERGY TO SMART GRID

Ziel

The target of the overall E2SG project is to devise and design mechanisms and policies to assemble, monitor and control smart grids, i.e. a set of interconnected nodes whose primary goal is to generate, exchange and consume electrical energy in the most efficient and reliable way by exploiting distributed information that is sensed, transmitted and processed over the same set of nodes and links. From this point of view, E2SG is complementary with respect to ERG that focuses on nodes with generation abilities whose interfaces are the main topic of common interest.
E2SG aims at addressing most of the challenges entailed in evolving the concept of smart-grid to the level needed by both the industrial players in the society of the next decades, and the uprising environmental awareness which will lead to the increasing exploitation of removable energy sources.

Aufforderung zur Vorschlagseinreichung

ENIAC-2011-1
Andere Projekte für diesen Aufruf anzeigen

Koordinator

STMICROELECTRONICS SRL
EU-Beitrag
€ 417 500,00
Adresse
VIA C.OLIVETTI 2
20864 Agrate Brianza
Italien

Auf der Karte ansehen

Region
Nord-Ovest Lombardia Monza e della Brianza
Aktivitätstyp
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Kontakt Verwaltung
Links
Gesamtkosten
Keine Daten

Beteiligte (31)