Cel During this demonstration project the main objectives are to design, install and operate a low pressure system to control the liquid metal flow from the outlet of the tundish of a slab caster machine to demonstrate the benefits in terms of product surface quality and cleanness. In addition, the engineering and process control aspects will be studied and optimised to work in harmony with specific plant production requirements. Program(-y) ECSC-STEELDEM 3C - Medium-term guidelines (ECSC) for the programmes of technical steel research and of steel pilot/demonstration projects, 1991-1995 Temat(-y) T2 - Continuous casting Zaproszenie do składania wniosków Data not available System finansowania Data not available Koordynator BRITISH STEEL, TEESSIDE TECHNOLOGY CENTRE Wkład UE Brak danych Adres Eston Road - P.O.Box 11 Grangetown TS6 6UB MIDDLESBROUGH Zjednoczone Królestwo Zobacz na mapie Koszt całkowity Brak danych