Skip to main content
European Commission logo print header
Inhalt archiviert am 2022-12-27

Optimum integration of daylighting components at the rehabilitation process of commercial buildings

Ziel

Determination of energy saving potential of daylight in existing commercial buildings.
Investigation of architectural and engineering procedures for the integration of daylight for several types of buildings
Guidelines for building professionals on the efficient integration of natural lighting techniques
Information if building users on the optimum use of daylight in existing buildings
Production of training material for architects and engineers
Dissemination of the daylighting knowledge via workshops and seminars

The integration of daylighting components into an existing building is not a trivial task, since it may also increase the heating energy demand and the overheating problem in summer. Thus a careful calculation of the consequences of the rehabilitation is mandatory.
On the other hand, it will make sense to get a slight increase of the heating demand through the rehabilitation, if the electric current consumption is reduced appropriately. In this case the primary energy consumption might be reduced considerably at all. Thus the rehabilitation procedure must include specific architectural and energy studies. the wrk of this project will be separated into the following phases:
1. Literature review.
2. Evaluation of the data material.
3. Detailed rehabilitation study of selected buildings.
4. Development of a rating system, edition of a resource guide book.
5. Dissemination of the results.

Aufforderung zur Vorschlagseinreichung

Data not available

Koordinator

Transsolar Energietechnik GmbH
EU-Beitrag
Keine Daten
Adresse
15,Nobelstraße
70569 Stuttgart
Deutschland

Auf der Karte ansehen

Gesamtkosten
Keine Daten

Beteiligte (1)