Design of new control and monitoring systems for wind turbines

Cel

The main objective of the project will be to design, develop and test new cost-effective control system components to be integrated in wind turbines of more than 1 MW of power. These new components and its specific objectives will be: . To design a new medium voltage (>=6,000 volt) synchronous generator, together with its frequency control system for 50 Hz . To design an advanced control algorithm that will act over the blade pitch and over the main shaft, in order to reduce mechanical and fatigue loads induced in all of the components of the wind turbine. . To establish a methodology of data acquisition for monitoring the real performance achieved in the machines and for the improvements achieved in load reduction and quality of the generated electricity

Zaproszenie do składania wniosków

Data not available

System finansowania

EAW - Exploratory awards

Koordynator

INGETEAM S.A.
Wkład UE
Brak danych
Adres
2,Pinto Maetzu 2
31008 PAMPLONA
Hiszpania

Zobacz na mapie

Koszt całkowity
Brak danych