Obiettivo - To develop, optimise and test a new control strategy for the optimisation of the electricity production of small hydropower plants;- to simplify and optimise the procedure of finding the best-performance-curve of a double regulated turbine;- to develop and test methods how to achieve the best performance from a set of turbines (multiple unit installations) using a self optimising algorithms;- to develop a graphical user interface for the adaptation and programming of the control software for the individual site, avoiding programming language skill for the manufacturer. Campo scientifico natural sciencescomputer and information sciencessoftwareengineering and technologyenvironmental engineeringenergy and fuelsrenewable energyhydroelectricity Programma(i) FP5-EESD - Programme for research, technological development and demonstration on "Energy, environment and sustainable development, 1998-2002" Argomento(i) 1.1.4.-6.5.4 - Other renewable energy sources Invito a presentare proposte Data not available Meccanismo di finanziamento Data not available Coordinatore Institute für solare Energieversorgungstechnik e.V. Contributo UE Nessun dato Indirizzo Königstor 59 34119 Kassel Germania Mostra sulla mappa Costo totale Nessun dato Partecipanti (2) Classifica in ordine alfabetico Classifica per Contributo UE Espandi tutto Riduci tutto IT Power Limited Regno Unito Contributo UE Nessun dato Indirizzo The Warren, Bramshill Road RG27 0PR Eversley, Hants Mostra sulla mappa Costo totale Nessun dato MITA-Teknik a/s Danimarca Contributo UE Nessun dato Indirizzo Haandvaerkerkvej 1 8840 Roedkaersbro Mostra sulla mappa Costo totale Nessun dato