Skip to main content
European Commission logo print header
Contenu archivé le 2022-11-21

Optimal strategy to minimise central segregation during billet casting of high carbon grades

Objectif

The aim of this P/D project is the minimisation of central segregation to enable the production of high carbon, quality critical, wire rod grades, such as tyre wire through the billet-casting route. For some steel-makers, this would enable the transfer of such steel grades to be moved from the higher cost large bloom process route. In addition, the development of a suitable route will provide the data necessary for the casting of proposed new generation steels for tyre cord and engineering applications.

Appel à propositions

Data not available

Régime de financement

CSC - Cost-sharing contracts

Coordinateur

British Steel plc
Contribution de l’UE
Aucune donnée
Adresse

TS6 6UB Middlesbrough
Royaume-Uni

Voir sur la carte

Coût total
Aucune donnée

Participants (3)