Skip to main content
European Commission logo print header
Contenu archivé le 2022-11-21

Further development of the direct strip casting process

Objectif

The general objective of the project is to develop a highly productive strip production process for all relevant steel grades. In this process the steel is cast on a moving belt cooled from below by water. After solidification and partial cooling in a protecting atmosphere, the steel strip with an as cast thickness of about 10 mm is continuously in-line hot rolled.

Appel à propositions

Data not available

Régime de financement

CSC - Cost-sharing contracts

Coordinateur

SALZGITTER
Contribution de l’UE
Aucune donnée
Adresse
Eisenhüttenstrasse, 99
38223 SALZGITTER
Allemagne

Voir sur la carte

Coût total
Aucune donnée

Participants (2)