Skip to main content
European Commission logo print header
Zawartość zarchiwizowana w dniu 2022-11-21

Development of high productivity casting of conventional & thin slabs

Cel

The final goal of the present Pilot/Demonstration project is to allow conventional continuous slab casters to reach the highest possible casting speed, compatible with their current metallurgical lengths, and to demonstrate the possibility for thin slab casters to reach casting speeds higher than 10m/mn. The study will focus on the medium carbon steels (0,1% equivalent carbon) and austenitic stainless steels. For thin-slab casters it is of the first importance to prove that it is possible to directly connect one strand caster with the rolling mill. For this, it is necessary to cast higher than 10m/min for all steel grades. This project proposes some very new approaches for the feeding of metal and the cooling of the thin slab.

Zaproszenie do składania wniosków

Data not available

System finansowania

CSC - Cost-sharing contracts

Koordynator

INSTITUT DE RECHERCHES DE LA SIDERURGIE FRANÇAISE
Wkład UE
Brak danych
Adres
Immeuble "PACIFIC", La Défense 7 11/13 Cours Valmy
92800 PUTEAUX
Francja

Zobacz na mapie

Koszt całkowity
Brak danych

Uczestnicy (1)