Objetivo In a previous ECSC-funded research project, the performances of a high- temperature metallic filter were investigated at a very small scale. The system was installed on a production plant and was shown to be capable of achieving outlet particulate concentrations of less than 10 mg/Nm3. Trace organic emissions were also reduced by injection of carbon-based adsorbents into the waste gas stream. The proposal is to build a larger scale plant and to install it on an operational sinter strand to further evaluate the performance of the filter under the conditions of continuous operation. Programa(s) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Tema(s) T1 - Iron and steelmaking Convocatoria de propuestas Data not available Régimen de financiación CSC - Cost-sharing contracts Coordinador CORUS UK LIMITED Aportación de la UE Sin datos Dirección 15 Great Marlborough Street W1F 7AS LONDON Reino Unido Ver en el mapa Coste total Sin datos