Objetivo A demonstration facility based on a regenerative thermal oxidisers (some 10.000 m3 (STP)/h) will be designed and installed in by-pass on a sinter plant, with the objectives to reduce dioxin emissions. By changing some operational parameters (reaction temperature, residence time, and specific flow rate), it will be possible to define the optimal operational conditions. Some numerical simulations of dioxin destruction will be done as well. Programa(s) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Tema(s) T1 - Iron and steelmaking Convocatoria de propuestas Data not available Régimen de financiación CSC - Cost-sharing contracts Coordinador AG DER DILLINGER HÜTTENWERKE Aportación de la UE Sin datos Dirección Werkstrasse, 6 66763 Dillingen Alemania Ver en el mapa Coste total Sin datos