Cel The aim of this project is to transfer the production of these steels, which are usually continuously cast in 240 mm square blooms and then reduced into 150 mm square billets before entering the rolling mill, to a continuous-casting line producing 150 mm square billets. This transposition calls for modifications to the deoxidation of the steel and the addition of Te, B or Bi in order to compensate for the resulting deterioration in machinability. Program(-y) ECSC-STEELRES 7C - Medium-term guidelines (ECSC) "technical steel research", 1986-1990 Temat(-y) C3 - Casting and solidification Zaproszenie do składania wniosków Data not available System finansowania CSC - Cost-sharing contracts Koordynator ARBED SAARSTAHL Wkład UE Brak danych Adres Bismarckstrasse 66333 VÖLKLINGEN Niemcy Zobacz na mapie Koszt całkowity Brak danych