Skip to main content
European Commission logo print header
Contenido archivado el 2022-11-21

The cyclone converter furnace (Part 1)

Objetivo

The economic evaluation of the replacement of an outdated ironworks with new coal-based direct reduction ironmaking technology has been completed in a preceding contract (7215.BA/601). The technical work has shown that the basic physical and chemical principles of the CCF process are sound and that all the engineering aspects can be solved. However, the proposed current phase of the project aims to further experiment the longevity and metallurgical efficiency of the cyclone as well as the conditions of linked smelting-reduction operation and scaling-up. This project will be coordinated at the European level as well as with project PP 189.

Convocatoria de propuestas

Data not available

Régimen de financiación

Data not available

Coordinador

MATERIALS RESEARCH CENTRE
Aportación de la UE
Sin datos
Dirección
Via di Castel Romano 100/102
00128 ROMA
Italia

Ver en el mapa

Coste total
Sin datos