Objectif The aim of this project is to produce coke with a low level of anisotropic phases and a high degree of stabilisation to reduce susceptibility to breakdown in a blast furnace operating at high levels of coal injection. This will be done by reducing the amounts of high-grade coals and increasing the use of well mixed fine-grain coke/petroleum coke in the coke oven blend, without altering the coking time. The breakdown performance of this coke in a furnace operating at more than 200 kg/tonne coal injection will be tested. Programme(s) ECSC-STEELRES 8C - Medium-term guidelines (ECSC) for the programmes of technical steel research and of steel pilot/demonstration projects, 1991-1995 Thème(s) B - Reduction of iron ores Appel à propositions Data not available Régime de financement CSC - Cost-sharing contracts Coordinateur THYSSEN STAHL Contribution de l’UE Aucune donnée Adresse Kaiser-Wilhelm-Strasse 100 47166 DUISBURG Allemagne Voir sur la carte Coût total Aucune donnée