Objectif The project deals with the control of the coating weight in the hot dip coating process. The current wiping technology used the gas knife system is limiting with regards to production of low coating weights and the line speeds at which they can be achieved.The development of new wiping techniques should enable a high line speed with a high flexibility on the final coating thickness. Hence, to overcome the current bottleneck of the galvanising line and so to pave the way for increased productivity, to extend possible coating range and high mastering of the production cost. Programme(s) ECSC-COAL-STEEL-RTD C - Research Programme of the Research Fund for Coal and Steel Thème(s) Data not available Appel à propositions Data not available Régime de financement Data not available Coordinateur CENTRE DE RECHERCHES METALLURGIQUES ASBL Contribution de l’UE Aucune donnée Adresse Avenue Ariane 5 1200 BRUXELLES Belgique Voir sur la carte Liens Site web Opens in new window Coût total Aucune donnée Participants (4) Trier par ordre alphabétique Trier par contribution de l’UE Tout développer Tout réduire ABB AUTOMATION TECHNOLOGIES AB Suède Contribution de l’UE Aucune donnée Adresse 72183 VÄSTER?S Voir sur la carte Liens Site web Opens in new window Coût total Aucune donnée ARCELOR RESEARCH S.A. France Contribution de l’UE Aucune donnée Adresse Immeuble La Pacific 92800 PUTEAUX Voir sur la carte Coût total Aucune donnée BETRIEBSFORSCHUNGSINSTITUT VDEH-INSTITUT FUR ANGEWANDTE FORSCHUNG GMBH Allemagne Contribution de l’UE Aucune donnée Adresse Sohnstrasse 65 40237 DUSSELDORF Voir sur la carte Liens Site web Opens in new window Coût total Aucune donnée CORUS TECHNOLOGY BV Pays-Bas Contribution de l’UE Aucune donnée Adresse WENCKEBACHSTRAAT 1 VELSEN NOORD Voir sur la carte Coût total Aucune donnée