Skip to main content
European Commission logo print header
Contenuto archiviato il 2022-11-21

Design for optimal life cycle costs (LCC) of high speed railway bridges by enhanced monitoring systems

Obiettivo

Steel-concrete composite bridges are an important alternative to concrete bridges due to considerable advantages regarding the design, construction time, durability and costs.

They are largely exploited in high-speed lines of the European railway networks even if a lot of still open problems in design and management limit their exploiting. The proposal aims to remove actual uncertainties on dynamic effects and interaction phenomena, fatigue loadings, structural modelling, fatigue life and damage assessment.

What�s more, such results will allow setting up an innovative design approach, able to minimize life-cycle costs guaranteeing adequate safety level and working conditions.

Argomento(i)

Data not available

Invito a presentare proposte

Data not available

Meccanismo di finanziamento

Data not available

Coordinatore

ILVA S.P.A.
Contributo UE
Nessun dato
Indirizzo
Viale Certosa, 249
20151 MILANO
Italia

Mostra sulla mappa

Collegamenti
Costo totale
Nessun dato

Partecipanti (8)