Objetivo The SPMMS project aimed to design and implement a system supporting all management activities in the software life-cycle. The SPMMS system was to be capable of monitoring the distributed engineering environment to determine the status of the development process. One of the most important requirements of the system was to be its adaptability to different management methods.The project planned to reach this objective by building a basic generic SPMMS kernel which is easily customisable, possibly using a rule-based approach. The project was to design and implement a system supporting all management activities in the software life cycle, capable of monitoring the distributed engineering environment to determine the status of the development process, and adaptable to different management methods. Results comprise: specification of the system; first prototype of the semantic data model; complete architectural design. Progress was made on mapping simplified work breakdown schedules onto the semantic data model. A subset of an organisation structure was successfully mapped and demonstrated. The project produced a prototype for the development of an information system to support management activities in the software product life cycle, constructed in Carnegie representation language (CRL). Implementation of the prototype in a portable common tool environment (PCTE) was completed. This included a semantic data model for software development projects in order to provide a conceptual schema of the project process. Functionalities have been implemented and demonstrated in a PCTE.Results comprise: -specification of the SPMMS system -first prototype of the semantic data model -complete architectural design. Progress was made on mapping simplified work breakdown schedules onto the semantic data model. A subset of an organisation structure was successfully mapped and demonstrated. The SPMMS project produced a prototype for the development of an information system to support management activities in the software product life-cycle, constructed in CRL (Carnegie Representation Language). Implementation of the easily customisable prototype in a PCTE environment was completed. This includes a semantic data model for software development projects in order to provide a conceptual schema of the project process. Functionalities have been implemented and demonstrated in a PCTE environment. Exploitation The SPMMS project contributed to the common data schema and the vocabulary used by several ESPRIT management tools projects. The project is expected to contribute to the PCTE by providing management tools operating on a data schema in a distributed PCTE system. Ámbito científico humanitiesartsarchitectural designnatural sciencescomputer and information sciencessoftwaresoftware development Programa(s) FP1-ESPRIT 1 - European programme (EEC) for research and development in information technologies (ESPRIT), 1984-1988 Tema(s) Data not available Convocatoria de propuestas Data not available Régimen de financiación Data not available Coordinador GSI TECSI Software SA Aportación de la UE Sin datos Dirección 6 Cours Michelet 92064 Paris la Défense Francia Ver en el mapa Coste total Sin datos Participantes (6) Ordenar alfabéticamente Ordenar por aportación de la UE Ampliar todo Contraer todo ALCATEL TITN Francia Aportación de la UE Sin datos Dirección QUAI DE DION BOUTON 92806 PUTEAUX Ver en el mapa Coste total Sin datos Data Management SpA Italia Aportación de la UE Sin datos Dirección Viale Eginardo 29 20149 Milano Ver en el mapa Coste total Sin datos GSI TECSI Software SA Francia Aportación de la UE Sin datos Dirección 6 Cours Michelet 92064 Paris la Défense Ver en el mapa Coste total Sin datos SEMA Metra Group SA Francia Aportación de la UE Sin datos Dirección 16 rue Barbes 92126 Montrouge Ver en el mapa Coste total Sin datos SOFEMASA España Aportación de la UE Sin datos Dirección C/PRINCESA 1 28008 MADRID Ver en el mapa Coste total Sin datos Siemens AG Alemania Aportación de la UE Sin datos Dirección Otto-Hahn-Ring 6 81739 München Ver en el mapa Coste total Sin datos