Skip to main content
European Commission logo print header

New small scale innovative energy biomass combustor

Ziel

Innovative combustion system: Compared to conventional grate-fired boilers, cost reduction min. 33%, from 175-235 EUR/kWth to 115 EUR/kWth (compact construction of the boiler, no refractory material); Low stack loss, boiler efficiency 3 % points higher; Equalised temperatures within furnace (high degree of turbulence); very compact combustion chamber; More complete combustion, even in the case of inhomogenities.

Scale up: Cost reduction by min. 33%, specific investment cost below 1500 EUR/kWel (simplification of every step; replication); net electric efficiency + 3% points; Thermal peak load coverage without increasing of rated power, electric power peak load coverage; Reduction of emissions (operation near the optimum). Demand side mgmt.: Complete new district heating system: less losses in the heating grid, smaller boiler for a maximum of full load operating hours. All: Shorter pay-back period (lower initial costs, higher efficiency and expected lower operational costs.

Thema/Themen

Data not available

Aufforderung zur Vorschlagseinreichung

Fifth Energie C
Andere Projekte für diesen Aufruf anzeigen

Finanzierungsplan

Data not available

Koordinator

WIENER STADTWERKE BETEILIGUNGSMANAGEMENT GMBH
EU-Beitrag
Keine Daten
Adresse
Dorotheergasse 7
VIENNA
Österreich

Auf der Karte ansehen

Gesamtkosten
Keine Daten

Beteiligte (5)