Skip to main content
European Commission logo print header

5mw innovative wind turbine suitable for on land and offshore installations

Objetivo

INNOWT5000 aims to cover the following objectives:
1. To design, manufacture and install a 5MW wind turbine (extendable to 5.5MW) suitable for offshore as well as for on land installations.
2. To develop products and procedures to overcome the barriers of transport and erection of MW class wind turbines
3. To respect the environment fully in line with the European directives, in every aspect, by adopting different philosophy and increased used of new and environmentally friendly materials and by incorporating it in every process of the manufacturing, transport, installation, operation and maintenance phase.
4. To reduce the electricity production costs by optimising the design to competitive levels, i.e. targeting to electricity production costs at below 0.035/kWh when the machine will be marketed.

Tema(s)

Data not available

Convocatoria de propuestas

Fifth Energie C
Consulte otros proyectos de esta convocatoria

Régimen de financiación

Data not available

Coordinador

REPOWER SYSTEMS AG
Aportación de la UE
Sin datos
Dirección
Flughafenstr. 54
HAMBURG
Alemania

Ver en el mapa

Coste total
Sin datos

Participantes (3)