Objective
This project aims at paving the road towards large-scale, Europe-wide infrastructure for the transport and injection of CO2 from zero-emission plants. The project will prepare for the optimum transition from initial small-scale, local initiatives towards large-scale CO2 transport and storage that is to start around 2020, with key stakeholders in the field of carbon capture, transport and storage. This transition, as well as the development of CO2 infrastructure will be studied by developing the business case in a number of realistic scenarios. The project will result in a roadmap for CO2 transport infrastructure, with 2020 as the target year for start of large-scale CCS in Europe. The roadmap will be defined for all levels considered in the project, ranging from technical to organizational, financial and societal.
Keywords
Call for proposal
FP7-ENERGY-2008-1
See other projects for this call
Funding Scheme
CP - Collaborative project (generic)Coordinator
2595 DA Den Haag
Netherlands
See on map
Participants (18)
1755 LE Petten
See on map
75007 Paris
See on map
814 26 ALVKARLEBY
See on map
9727KC Groningen
See on map
3115 HC Schiedam
See on map
80333 Munchen
See on map
22297 Hamburg
See on map
3068 AX Rotterdam
See on map
00 496 Warszawa
See on map
14053 Praha 4
See on map
2288 GK RIJSWIJK ZH
See on map
3071AG ROTTERDAM
See on map
3605 Kongsberg
See on map
2992LC BARENDRECHT
See on map
4250 Kopervik
See on map
3016 BE ROTTERDAM
See on map
B37 7YE Birmingham
See on map
3011 TA Rotterdam
See on map