Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Subject

Aerospace Technology (5)
Agricultural biotechnology (2)
Agriculture (23)
Biotechnology (35)
Business aspects (8)
Climate change and Carbon cycle research (2)
Construction Technology (4)
Coordination and Cooperation (92)
Earth Sciences (9)
Economic Aspects (102)
Education and Training (30)
Electronics and Microelectronics (13)
Employment issues (4)
Energy Saving (39)
Energy Storage and Energy Transport (7)
Environmental Protection (103)
Evaluation (4)
Food (31)
Forecasting (11)
Healthcare delivery/services (4)
Industrial Manufacture (66)
Information Processing and Information Systems (100)
Information and Media (25)
Information and communication technology applications (18)
Innovation and Technology Transfer (72)
Intellectual property rights (1)
Legislation and Regulations (21)
Life Sciences (86)
Materials Technology (27)
Mathematics and Statistics (2)
Measurement Methods (7)
Medical biotechnology (7)
Medicine and Health (84)
Meteorology (8)
Nanotechnology and Nanosciences (5)
Network technologies (4)
Nuclear Fission (13)
Nuclear Fusion (2)
Other Energy Topics (7)
Other Technology (11)
Policies (43)
Project management methodologies (1)
Radiation Protection (2)
Radioactive Waste (1)
Reference Materials (7)
Regional Development (63)
Renewable Sources of Energy (23)
Research ethics (5)
Resources of the Sea and Fisheries (22)
Safety (53)
Scientific Research (261)
Security (6)
Social sciences and humanities (133)
Space and satellite research (4)
Standards (16)
Sustainable development (5)
Telecommunications (58)
Transport (19)
Waste Management (6)
Water resources and management (1)

Programme

Other
All
CIP (30)
ECSC-COAL-STEEL-RTD C (2)
ET-LEONARDO DA VINCI 1 (2)
FP4-ACTS (2)
FP4-FAIR (2)
FP4-INCO (39)
FP4-SMT (1)
FP4-TELEMATICS 2C (1)
FP4-TSER (1)
H2020-EU.1.1.
H2020-EU.1.3.1.
H2020-EU.1.3.2.
H2020-EU.1.3.3.
H2020-EU.1.3.5.
H2020-EU.1.4.1.2.
H2020-EU.1.4.1.3.
H2020-EU.2.
H2020-EU.2.1.1.
H2020-EU.2.1.1.3.
H2020-EU.2.1.1.6.
H2020-EU.2.1.1.7.
H2020-EU.2.1.2.
H2020-EU.2.1.3.
H2020-EU.2.1.5.
H2020-EU.2.1.5.1.
H2020-EU.2.1.5.3.
H2020-EU.2.1.6.
H2020-EU.2.1.6.1.2.
H2020-EU.2.1.6.3.
H2020-EU.2.3.
H2020-EU.2.3.1.
H2020-EU.2.3.2.
H2020-EU.2.3.2.2.
H2020-EU.3.
H2020-EU.3.1.2.
H2020-EU.3.1.4.
H2020-EU.3.1.6.
H2020-EU.3.2.
H2020-EU.3.2.1.
H2020-EU.3.2.1.1.
H2020-EU.3.2.1.4.
H2020-EU.3.2.2.
H2020-EU.3.2.2.3.
H2020-EU.3.2.4.
H2020-EU.3.2.6.
H2020-EU.3.3.
H2020-EU.3.3.1.
H2020-EU.3.3.2.
H2020-EU.3.3.2.1.
H2020-EU.3.3.2.2.
H2020-EU.3.3.2.4.
H2020-EU.3.3.3.
H2020-EU.3.3.4.
H2020-EU.3.3.6.
H2020-EU.3.3.7.
H2020-EU.3.3.8.2.
H2020-EU.3.4.
H2020-EU.3.4.7.
H2020-EU.3.5.
H2020-EU.3.5.2.
H2020-EU.3.5.3.
H2020-EU.3.5.4.
H2020-EU.3.5.5.
H2020-EU.3.5.6.
H2020-EU.3.6.
H2020-EU.3.6.1.1.
H2020-EU.3.6.1.2.
H2020-EU.3.6.1.4.
H2020-EU.3.6.2.
H2020-EU.3.6.2.2.
H2020-EU.3.6.3.
H2020-EU.3.7.1.
H2020-EU.3.7.2.
H2020-EU.3.7.3.
H2020-EU.3.7.5.
H2020-EU.3.7.6.
H2020-EU.3.7.7.
H2020-EU.3.7.8.
H2020-EU.4.a.
H2020-EU.5.a.
H2020-EU.5.b.
H2020-EU.5.c.
H2020-EU.5.f.
H2020-Euratom
H2020-Euratom-1.1.
H2020-Euratom-1.2.
H2020-Euratom-1.3.
H2020-Euratom-1.4.
H2020-Euratom-1.8.
IC-COST (1)
IC-INTAS (12)
IC-PECO/COPERNICUS (65)
IS-ECONTENT (7)

Content type

Project (1001)
Result in Brief (130)
Report Summary (47)

Advanced search

Search projects and results

Results 1 - 10 of 1178
Results/page:
12 3 4 5 6 7 8 9 10 > >| 
Integrated Airport Operations
[PROJECT] PJ28 IAO - Integrated Airport Operations
ID: 731787
Start date: 2016-12-01, End date: 2019-11-30
"This project PJ28 which is part of the SESAR 2020 Multi annual Program (S2020 MAWP) for the period 2016-2019, will demonstrate the benefits that specific promising SESAR solutions will bring in a large and two mid-size airports, where traffic congestion daily takes place...
Programme: H2020-EU.3.4.7.
Record Number: 206576
Last updated on: 2017-07-24
Enhanced Arrivals and Departures
[PROJECT] PJ01 EAD - Enhanced Arrivals and Departures
ID: 731864
Start date: 2016-11-01, End date: 2019-12-31
In order to meet forecast traffic growth, PJ01 will develop concepts, tools and procedures to increase the capacity of Terminal Manoeuvring Areas (TMAs) in a safe, cost-effective and environmentally sustainable manner. This will be achieved by taking advantage of the latest...
Programme: H2020-EU.3.4.7.
Record Number: 206248
Last updated on: 2017-06-10
SWIM Technical Infrastructure
[PROJECT] PJ17 SWIM-TI - SWIM Technical Infrastructure
ID: 731826
Start date: 2016-11-01, End date: 2019-12-31
Single European Sky – the vision is clearly described in the European ATM Master Plan. Reaching the goals for the European Airspace is only possible with focused and extensive technical developments on European level. One of the major challenges is making sure every actor in...
Programme: H2020-EU.3.4.7.
Record Number: 206402
Last updated on: 2017-07-24
Controller Working Position / Human Machine Interface - CWP/HMI
ID: 734141
Start date: 2016-11-01, End date: 2019-12-31
PJ.16 project aims to reduce development and operating costs of Air Navigation Service Providers (ANSP). These savings will ultimately benefit airlines and their customers. It achieves this by delivering the ATM Master Plan goals (defined by the European Air Traffic Management...
Programme: H2020-EU.3.4.7.
Record Number: 206257
Last updated on: 2017-07-24
SeaDataNet II: Pan-European infrastructure for ocean and marine data management
ID: 283607
Start date: 2011-10-01, End date: 2015-09-30
The overall objective of the SeaDataNet II project is to upgrade the present SeaDataNet infrastructure into an operationally robust and state-of-the-art Pan-European infrastructure for providing up-to-date and high quality access to ocean and marine metadata, data and data pr...
Programme: FP7-INFRASTRUCTURES
Record Number: 100341
Last updated on: 2016-10-31
Controller Tools and Team Organisation for the Provision of Separation in Air Traffic Management
ID: 734143
Start date: 2016-11-01, End date: 2019-12-31
Single European Sky – the vision is clearly described in the ATM Masterplan. Reaching the goals for the European Airspace is only possible with focused technical developments on European level.The air traffic controller is the main player in the traffic management at...
Programme: H2020-EU.3.4.7.
Record Number: 206393
Last updated on: 2017-07-24
Integrated Surface Management
[PROJECT] PJ03a SUMO - Integrated Surface Management
ID: 734153
Start date: 2016-12-01, End date: 2019-12-31
The project PJ.03a is part of the SESAR 2020 Multi Annual Program for the period 2016-2019. It is allocated to the Industrial Research & Validation phase, developed under the SJU Private Public Partnership and will contribute to the key feature High Performing Airport...
Programme: H2020-EU.3.4.7.
Record Number: 206846
Last updated on: 2017-06-10
European Network to Support the Sustainable Surface Transport SMEs
ID: 218605
Start date: 2008-05-01, End date: 2011-01-31
The strategic objective of the Star-Net transport is to increase the participation of surface transport-related SMEs in the surface transport programe. The aim of the Star-Net transport project is to be the first step towards the formation and development of a consolidated st...
Programme: FP7-TRANSPORT
Record Number: 88866
Last updated on: 2017-05-29
Remote Tower for Multiple Airports
[PROJECT] PJ05 Remote Tower - Remote Tower for Multiple Airports
ID: 730195
Start date: 2016-11-01, End date: 2019-11-30
"Cost-effectiveness, clearly described in the topic SESAR.IR-VLD.Wave1-08-2015 as the main key performance area (KPA), is the principal KPA addressed by “PJ05 Remote Tower” project. It proposes the development of a remotely provided aerodrome air traffic service by a...
Programme: H2020-EU.3.4.7.
Record Number: 206394
Last updated on: 2017-07-24
Increased Runway and Airport Throughput
ID: 731781
Start date: 2016-12-01, End date: 2019-12-31
EUROCONTROL’s 2013 Challenges of Growth Report “by 2035 more than 20 airports are operating at 80% or more of capacity for 6 or more hours per day … drives ATFCM airport delay up from around 1 minute/flight in 2012 to 5-6 minutes in 2035.”Whereas social, economic and...
Programme: H2020-EU.3.4.7.
Record Number: 206844
Last updated on: 2017-07-24
12 3 4 5 6 7 8 9 10 > >| 
List retrieved on: 2017-11-24
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top