Community Research and Development Information Service - CORDIS

Search projects and results

Results 1 - 10 of 58
Results/page:
12 3 4 5 6 > 
Land use policies and sustainable development in developing Countries
ID: 36955
Start date: 2007-02-01, End date: 2011-03-31
The proposed project will develop integrated assessment tools for sustainable development for application by scientists in a selected number of developing countries. Attention will be given to both natural and agricultural ecosystems. The project provides assessment procedures...
Programme: FP6-SUSTDEV
Record Number: 81388
Last updated on: 2011-07-15
African monsoon multidisciplinary analysis
ID: 004089
Start date: 2005-01-01, End date: 2009-12-31
The dramatic change in the region of the West African monsoon (WAM) from wet conditions in the 50s and 60s to much drier conditions from the 70s to the 90s represents one of the strongest inter-decadal signals on the planet in the 20th century. Marked inter-annual variations i...
Programme: FP6-SUSTDEV
Record Number: 85507
Last updated on: 2012-02-13
TWINBASINXN : Promoting Twinning of River Basins for Developing Integrated Water Resources Management Practices
ID: 1450
Start date: 2004-01-01, End date: 2007-12-31
A Basin Organisation is generally regarded as one of the best solutions to adopt for developing an Integrated Water Resources Management (IWRM) at a catchment level. There have then been many types of BO, some of them existing for several decades, and a lot in a development pr...
Programme: FP6-SUSTDEV
Record Number: 74237
Last updated on: 2009-02-27
Improved microreactor
[REPORT SUMMARY] Improved microreactor
An improved micro reactor set-up that enables in situ optical observations of a single polymer particle during its growth is developed. The optical microscopy is used for direct measurement of polymer growth in gas-phase ethylene polymerization and ethylene/1-hexene copolymeri...
Programme: FP5-GROWTH
Record Number: 39637
Last updated on: 2006-02-28
Development of superior catalysts for the reaction of oxidative dehydrogenation of ethane (ODHE- high and low temperature)
The preconditions were fixed by DSM: Targets: -ethylene yield 70% per pass, -catalyst productivity higher than 0.2 kg ethylene/kg catalyst. h, -P 2-3 atm in final testing, -use of oxygen in stead of air -complete conversion of oxygen, -dilution preferably with steam ...
Programme: FP5-GROWTH
Record Number: 39549
Last updated on: 2006-02-28
173.6 kWp - PV Installation
[REPORT SUMMARY] 173.6 kWp - PV Installation
In general the project was prepared very well and not many unexpected problems occurred. A total of 5 different manufacturers/installing companies were invited for the bidding. The contract was won by Stroomwerk bv from Deventer. There were two problems with the construction ...
Programme: FP5-EESD
Record Number: 37319
Last updated on: 2005-09-21
Measurement method for elastomeric polyolefins
Powder and pellets behave more difficult than gases or liquids when transported or stored in chemical plants. Wrong design or operation of transport lines and storage facilities may cause blockage of these devices, resulting in plant shutdown (for cleaning) and production loss...
Programme: FP5-GROWTH
Record Number: 39644
Last updated on: 2007-08-21
WP8 Task 3.5 - Action plan for each teaming arrangement agreed
Having identified the areas where further research work is needed (WP2) and having decided on the teaming arrangements, an action plan for the resulting teams has been set-up. This includes regular contact of the team members, either under the auspices of EVI-GTI, or on a bila...
Programme: FP5-GROWTH
Record Number: 39578
Last updated on: 2006-02-28
WP8 Task 3.4 - Teaming arrangements/training schemes agreed
This task focuses particularly on one of the important objectives of WP8, namely the improvement of rapid technology transfer. The link has to be made here with other work packages to provide answers to the following questions: what are the topics of interest where rapid techn...
Programme: FP5-GROWTH
Record Number: 39577
Last updated on: 2006-02-28
WP8, Task 1.5 - University and SME constituent groups finalised and audited
The objectives of WP8 are in the field of streamlining the formation of research teams in specific areas as they emerge from other work packages in the EVI-GTI program. The research teams need a clear and fast communication structure to ensure that they can act in an effective...
Programme: FP5-GROWTH
Record Number: 39573
Last updated on: 2006-02-28
12 3 4 5 6 > 
List retrieved on: 2017-09-24
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top