Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Content type

Project (409)

Country

Belgium (20)
Denmark (21)
France (88)
Germany (87)
Greece (36)
Ireland (23)
Italy (66)
Luxembourg (3)
Netherlands (25)
United Kingdom (40)

Advanced search

Search projects and results

Results 1 - 10 of 409
Results/page:
12 3 4 5 6 7 8 9 10 > >| 
ID: SE./00313/83
Start date: 1984-06-01, End date: 1990-03-31
To demonstrate the performance and reliability of a stand-alone pv plant to supply electricity to two villages on the Greek island of Gavdos. Gavdos island is situated in the southermost part of Europe. A pv plant consisting of a 20 kWp array, battery storage and an inverter s...
Programme: ENG-ENALT 2C
Record Number: 16229
Last updated on: 1999-10-21
ID: EE./00096/84
Start date: 1985-02-01, End date: 1986-01-31
To verify the energy savings and the operating costs shown in trials in which an extrusion-type pulping machine was used instead of the conventional mill-type pulping machines. Savings of the order of 80 per cent seem feasible, although 40 per cent would already be considered ...
Programme: ENG-ENALT 2C
Record Number: 14565
Last updated on: 1999-10-21
ID: HY./00229/84
Start date: 1985-01-01, End date: 1988-11-01
To harness energy, which was previously wasted, at a water treatment plant through the insertion of a small hydro electric generating unit whilst maintaining normal operation of the plant at all times.
Programme: ENG-ENALT 2C
Record Number: 15811
Last updated on: 1999-10-21
ID: EC./00483/85
Start date: 1987-06-01, End date: 1992-12-31
To increase the flexibility and reduce cost of multi-rate tariff metering it was decided to : (a) Develop the best features of the individual products of solid state meters, radio-teleswhich and multi-rate tariff unit, available to the industry, into an integrated dual circuit...
Programme: ENG-ENALT 2C
Record Number: 15621
Last updated on: 1998-08-04
ID: HY./00645/84
Start date: 1986-11-01, End date: 1991-02-28
The installation of a tubular turbine/generating unit in a water supply aqueduct. The anticipated annual energy output is 4,170,000 KWh and the unit cost of energy production is 3. 32 Drs/KWh.
Programme: ENG-ENALT 2C
Record Number: 15789
Last updated on: 1999-10-21
ID: EE./00261/84
Start date: 1985-01-01, End date: 1987-12-31
A 2400 m2 existing office building has to be refurnished to allow the proper use of monitors, micro-computers etc... . The building is to be equipped with an integrated HVAC installation. The relevant electricity consumption should not exceed 34 MWh/yr and the inside temperatu...
Programme: ENG-ENALT 2C
Record Number: 14637
Last updated on: 1999-10-21
ID: EE./00252/84
Start date: 1986-04-15, End date: 1989-02-15
Promotion of a thermo-electric micro-station to cover the heat and part of the electricity requirements of a 10 flat building. The payback time of the project is expected to be 16 years. It is strongly dependent on the possibility of purchasing electricity from the public netw...
Programme: ENG-ENALT 2C
Record Number: 14631
Last updated on: 1999-10-21
ID: SE./00397/83
Start date: 1983-11-01, End date: 1988-04-30
To demonstrate that annual energy savings of 120 MWh and 140 MWh can be achieved in school heating and air conditioning of an office building by the use of innovative multiple fabric blinds, developed by ISE (Institute for Solar Systems of Fraunhofer-Ges.)
Programme: ENG-ENALT 2C
Record Number: 16224
Last updated on: 2012-06-12
ID: SE./00134/83
Start date: 1983-12-01, End date: 1990-12-31
Power supplies for remote houses without grid connection (10000 in Germany, guessed 300000 in Europe) represent a very attractive market for photovoltaics. Up to now, the only available option was the installation of a Diesel generator with a high pollution level and a discont...
Programme: ENG-ENALT 2C
Record Number: 15725
Last updated on: 2012-06-12
ID: GE./00607/83
Start date: 1985-09-01, End date: 1985-12-31
To demonstrate the economic viability of using geothermal heat (76 deg. C) from the Southampton 1 well with a flow-rate of 20 l/s ( drilled with EEC support - see GE/69/81), to heat buildings at a cost more favourable than the alternative low fuel. A civic centre and swimming ...
Programme: ENG-ENALT 2C
Record Number: 15840
Last updated on: 1999-10-21
12 3 4 5 6 7 8 9 10 > >| 
List retrieved on: 2017-06-26