Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Content type

Project (73)
Report Summary (2)

Country

Belgium (6)
Denmark (1)
France (31)
Germany (42)
Italy (13)
Netherlands (6)
Spain (8)
United Kingdom (25)

Advanced search

Search projects and results

Results 1 - 10 of 75
Results/page:
12 3 4 5 6 7 8 > 
The aim of the project was to build and test a robotic system to dismantle a reprocessing plant according to the contact cell philosophy. The system consists of a servomanipulator installed in a containment box. The box is positioned over the process cell and communicates with...
Programme: FP2-DECOM 3C
Record Number: 4345
Last updated on: 1998-02-03
[REPORT SUMMARY] Release measurement facility
The nuclear power plant Rheinsberg (KKR) was closed down in 1990. Until that time there did not exist any procedures for the unrestricted release of materials out of the controlled area. The type of KKR wastes and its nuclide composition are different compared to Western light...
Programme: FP2-DECOM 3C
Record Number: 6334
Last updated on: 1998-03-10
ID: FI2D0023
Start date: 1990-07-01, End date: 1994-06-30
JEN-1 is an experimental reactor of the swimming-pool type, moderated and cooled by light water, with a power of 3 MWt. It was operated from 1958 till 1984 with a total generated energy of 2,700 MWd. The radioactive inventory is estimated in the order of 3.5E11 Bq (9.5 Ci), th...
Programme: FP2-DECOM 3C
Record Number: 2568
Last updated on: 1996-01-09
ID: FI2D0044
Start date: 1990-10-01, End date: 1994-06-30
As part of the preparatory work for Stage 3 decommissioning of the G2/G3 gas-cooled reactors at Marcoule, the project involves: quantifying the activity levels of complex core structures based on theoretical analysis and on a large number of dose rate measurements; design o...
Programme: FP2-DECOM 3C
Record Number: 2757
Last updated on: 1996-01-09
ID: FI2D0012
Start date: 1990-07-01, End date: 1993-12-01
The objective of this work is to use existing equipment developed under the Harwell Nuclear Robotics Programme to investigate and demonstrate the feasibility of telerobotic monitoring, decontamination and size-reduction systems (TMDSRS). The work will include experimental inve...
Programme: FP2-DECOM 3C
Record Number: 2557
Last updated on: 1996-01-09
ID: FI2D0011
Start date: 1990-07-01, End date: 1993-12-01
The Riso Hot Cell Facility, which was in operation for 26 years (1964-1990), comprises 6 concrete cells, lead cells, glove boxes, a shielded unit for temporary storage of waste until shipment, a frogman area, decontamination areas, workshops, various installations of importanc...
Programme: FP2-DECOM 3C
Record Number: 2556
Last updated on: 1996-01-09
ID: FI2D0017
Start date: 1990-07-01, End date: 1993-12-01
The objective of the laboratory-scale investigations is the development of chemical processes for the treatment of radioactive graphite for its safe storage. It consists of: previous extraction of radionuclides (mainly tritium) to decrease the radioactivity of graphite; fix...
Programme: FP2-DECOM 3C
Record Number: 2562
Last updated on: 1996-01-09
ID: FI2D0062
Start date: 1990-07-01, End date: 1994-06-30
JEN-1 is an experimental reactor of the swimming-pool type, moderated and cooled by light water, with a power of 3 MWt. It was operated from 1958 till 1984 with a total generated energy of 2,700 MWd. The radioactive inventory is estimated in the order of 3.5E11 Bq (9.5 Ci), th...
Programme: FP2-DECOM 3C
Record Number: 4189
Last updated on: 1996-01-09
ID: FI2D0067
Start date: 1991-12-01, End date: 1993-12-01
The objective of this project is to verify the efficiency of the chemical, electrochemical and physical decontamination processes for the decommissioning of WWER-type pressurized water reactors. The testing of chemical processes has priority, as only these could be applied in ...
Programme: FP2-DECOM 3C
Record Number: 4201
Last updated on: 1996-01-09
ID: FI2D0026
Start date: 1990-07-01, End date: 1993-06-01
During decommissioning of nuclear facilities, small bore pipework needs to be cut remotely up to distances of 10m with access through the top of the pile cap. Often, due to the close packing of the pipework, the cutting operation must be performed internally through the bore o...
Programme: FP2-DECOM 3C
Record Number: 2571
Last updated on: 1996-01-09
12 3 4 5 6 7 8 > 
List retrieved on: 2017-07-21
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top