Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Content type

Project (6)

Country

Greece (1)
Ireland (4)

Advanced search

Search projects and results

Results 1 - 6 of 6
Results/page:
1
ID: 438/90/12/FUA/IRL
Start date: 1991-01-01, End date: 1992-06-30
This Cost-Sharing Action by University College, Cork, Ireland concerns the development of a Far Infra Red (FIR) polarimetry diagnostic for inclusion on the RFX device at the Istituto Gas Ionizzati, Padova. It constitutes a pilot project to demonstrate with a single chord the...
Programme: FP2-FUSION 10C
Record Number: 17338
Last updated on: 1992-10-26
ID: 401/89/11/FUA/IRL
Start date: 1988-10-01, End date: 1992-10-01
The proposal is for an analytical and computational study of the effects of flow on resistive instabilities in MHD. The presence of equilibrium plasma flow along the confining magnetic field lines significantly modifies the stability of tearing modes and gravitational intercha...
Programme: FP2-FUSION 10C
Record Number: 17336
Last updated on: 1992-10-26
ID: 131/83/7/FUS/C/MOB
Start date: 1992-02-01, End date: 1992-12-31
Agreement intended to promote the mobility of scientific staff between laboratories.
Programme: FP2-FUSION 10C
Record Number: 17335
Last updated on: 1992-10-26
ID: 417/90/4/FUA/IRL
Start date: 1990-01-01, End date: 1992-12-31
This project consists in establishing direct access, from the University College of Cork, to the Spectroscopic data of the COMPASS Tokamak at UKAEA - Culham. The Computer Packet Switching Network will be used to transfer data between Culham and Cork.
Programme: FP2-FUSION 10C
Record Number: 17339
Last updated on: 1992-10-26
ID: 385/89/7/FUA/IRL
Start date: 1989-01-01, End date: 1994-12-31
The increasing accuracy and sophistication of plasma diagnostic data measurement techniques makes corresponding demands on the between-shot data interpretation system. The stringent requirement of real-time non-circular Tokamak control systems for rapid information on the posi...
Programme: FP2-FUSION 10C
Record Number: 17337
Last updated on: 1992-10-26
ID: 439/90/12/FUA/GR
Start date: 1991-01-01, End date: 1994-12-31
The contract concerns the manufacturing, testing, installation and operation of a Langmuir Probe System (LPS) for the diagnosis of Divertor Plasma of ASDEX-Upgrade (AUG).
Programme: FP2-FUSION 10C
Record Number: 17342
Last updated on: 1992-10-26
1
List retrieved on: 2017-07-27
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top