Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Content type

Project (29)

Advanced search

Search projects and results

Results 1 - 10 of 29
Results/page:
12 3 > 
Cyber Physical System based Proactive Collaborative Maintenance
ID: 662189
Start date: 2015-05-01, End date: 2018-04-30
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no...
Programme: H2020-EU.2.1.1.7.
Record Number: 198079
Last updated on: 2017-06-23
Electronics and ICT as enabler for digital industry and optimized supply chain management covering the entire product lifecycle
ID: 737459
Start date: 2017-05-01, End date: 2020-04-30
PRODUCTIVE4.0 - AMBITIOUS PROJECT WITH A UNIQUE MAIN OBJECTIVEThe main objective of Productive4.0 is to achieve improvement of digitising the European industry by electronics and ICT. Ultimately, the project aims at suitability for everyday application across all industrial...
Programme: H2020-EU.2.1.1.7.
Record Number: 210800
Last updated on: 2017-06-23
Intelligent Motion Control Platform for Smart Mechatronic Systems
ID: 737453
Start date: 2017-06-01, End date: 2020-05-31
The I-MECH target is to provide augmented intelligence for wide range of cyber-physical systems having actively controlled moving elements, hence support development of smarter mechatronic systems. They face increasing demands on size, motion speed, precision, adaptability...
Programme: H2020-EU.2.1.1.7.
Record Number: 210799
Last updated on: 2017-05-30
Secure COnnected Trustable Things
ID: 737422
Start date: 2017-05-01, End date: 2020-06-30
Creating trust in wireless solutions and increasing social acceptance are major challenges to achieve the full potential of the Internet of Things. SCOTT, with 57 key partners from 12 countries (EU + Brazil), will provide efficient solutions of wireless, end-to-end secure...
Programme: H2020-EU.2.1.1.7.
Record Number: 210798
Last updated on: 2017-05-23
European Initiative to Enable Validation for Highly Automated Safe and Secure Systems
ID: 692455
Start date: 2016-05-01, End date: 2019-04-30
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods...
Programme: H2020-EU.2.1.1.7.
Record Number: 203396
Last updated on: 2017-05-09
Rf Engineered substrates to FostER fEm performaNCE
ID: 692477
Start date: 2015-12-01, End date: 2019-05-31
The REFERENCE project aims to leverage a European leading edge Radio Frequency (RF) ecosystem based on RF Silicon On Insulator (SOI) disruptive technology, perceived as the most promising to address performance, cost and integration needs for RF Front End Modules (FEMs)s.The...
Programme: H2020-EU.2.1.1.7.
Record Number: 204781
Last updated on: 2017-02-22
Seven Nanometer Technology
[PROJECT] SeNaTe - Seven Nanometer Technology
ID: 662338
Start date: 2015-04-01, End date: 2018-03-31
The SeNaTe project is the next in a chain of thematically connected ENIAC JU KET pilot line projects which are associated with 450mm/300mm development for the 12nm and 10nm technology nodes. The main objective is the demonstration of the 7nm IC technology integration in line...
Programme: H2020-EU.2.1.1.7.
Record Number: 198669
Last updated on: 2017-06-10
An integrated pilot line for micro-fabricated medical devices
ID: 662155
Start date: 2015-06-01, End date: 2018-05-31
The goal of the InForMed project is to establish an integrated pilot line for medical devices. The pilot line includes micro-fabrication, assembly and even the fabrication of smart catheters. The heart of this chain is the micro-fabrication and assembly facility of Philips...
Programme: H2020-EU.2.1.1.7.
Record Number: 198016
Last updated on: 2017-06-27
Integrated Components for Complexity Control in affordable electrified cars
ID: 662192
Start date: 2015-06-01, End date: 2018-05-31
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation...
Programme: H2020-EU.2.1.1.7.
Record Number: 197903
Last updated on: 2017-05-09
Which Architecture Yields Two Other Generations Of Fully depleted Advanced Substrate and Technologies
ID: 662175
Start date: 2015-05-01, End date: 2017-09-30
The proposed pilot line project WAYTOGO FAST objective is to leverage Europe leadership in Fully Depleted Silicon on Insulator technology (FDSOI) so as to compete in leading edge technology at node 14nm and beyond preparing as well the following node transistor architecture...
Programme: H2020-EU.2.1.1.7.
Record Number: 197526
Last updated on: 2017-06-27
12 3 > 
List retrieved on: 2017-07-27
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top