Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Content type

Project (12)

Advanced search

Search projects and results

Results 1 - 10 of 12
Results/page:
12 > 
Advancing Smart Optical Imaging and Sensing for Health
ID: 692470
Start date: 2016-06-01, End date: 2019-05-31
The ageing population and related increase in chronic diseases put considerable pressure on both the healthcare system and the society, resulting in an unsustainable rise of healthcare costs. As a result there is an urgent need to improve efficiency of care and reduce...
Programme: H2020-EU.2.1.1.7.
Record Number: 203399
Last updated on: 2017-02-01
Safe Cooperating Cyber-Physical Systems using Wireless Communication
ID: 692529
Start date: 2016-04-01, End date: 2019-03-31
SafeCOP (Safe Cooperating Cyber-Physical Systems using Wireless Communication) will establish a safety assurance approach, a platform architecture, and tools for cost-efficient and practical certification of cooperating cyber-physical systems (CO-CPS).SafeCOP targets...
Programme: H2020-EU.2.1.1.7.
Record Number: 203404
Last updated on: 2017-01-26
European Initiative to Enable Validation for Highly Automated Safe and Secure Systems
ID: 692455
Start date: 2016-05-01, End date: 2019-04-30
ENABLE-S3 will pave the way for accelerated application of highly automated and autonomous systems in the mobility domains automotive, aerospace, rail and maritime as well as in the health care domain. Virtual testing, verification and coverage-oriented test selection methods...
Programme: H2020-EU.2.1.1.7.
Record Number: 203396
Last updated on: 2017-01-26
aDverse wEather eNvironmental Sensing systEm
ID: 692449
Start date: 2016-06-01, End date: 2019-05-31
Current driver assistance systems are not all-weather capable. They offer comfort and safety in sound environmental conditions. However, in adverse weather conditions where the accident risks are highest they malfunction or even fail. Now that we are progressing towards...
Programme: H2020-EU.2.1.1.7.
Record Number: 203395
Last updated on: 2017-01-16
Advanced Distributed Pilot Line for More-than-Moore Technologies
ID: 661796
Start date: 2015-05-01, End date: 2019-04-30
The “Advanced Distributed Pilot Line for More-than-Moore Technologies” project (ADMONT) is focused on a powerful and versatile More-than-Moore (MtM) pilot line for Europe increasing the diversification of CMOS process technologies. The combination of existing expertise...
Programme: H2020-EU.2.1.1.7.
Record Number: 198078
Last updated on: 2017-01-11
Cyber Physical System based Proactive Collaborative Maintenance
ID: 662189
Start date: 2015-05-01, End date: 2018-04-30
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no...
Programme: H2020-EU.2.1.1.7.
Record Number: 198079
Last updated on: 2017-02-01
An integrated pilot line for micro-fabricated medical devices
ID: 662155
Start date: 2015-06-01, End date: 2018-05-31
The goal of the InForMed project is to establish an integrated pilot line for medical devices. The pilot line includes micro-fabrication, assembly and even the fabrication of smart catheters. The heart of this chain is the micro-fabrication and assembly facility of Philips...
Programme: H2020-EU.2.1.1.7.
Record Number: 198016
Last updated on: 2017-01-18
Integrated Components for Complexity Control in affordable electrified cars
ID: 662192
Start date: 2015-06-01, End date: 2018-05-31
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation...
Programme: H2020-EU.2.1.1.7.
Record Number: 197903
Last updated on: 2017-01-26
Which Architecture Yields Two Other Generations Of Fully depleted Advanced Substrate and Technologies
ID: 662175
Start date: 2015-05-01, End date: 2017-09-30
The proposed pilot line project WAYTOGO FAST objective is to leverage Europe leadership in Fully Depleted Silicon on Insulator technology (FDSOI) so as to compete in leading edge technology at node 14nm and beyond preparing as well the following node transistor architecture...
Programme: H2020-EU.2.1.1.7.
Record Number: 197526
Last updated on: 2017-01-26
Preparing R2 extension to 300mm for BCD Smart Power
ID: 653933
Start date: 2015-07-01, End date: 2018-06-30
R2POWER300 is committed to challenge the following Objectives: • Development and manufacturing of a multi-KET Pilot Line (i.e. Nanoelectronics, Nanotechnology, Advanced Manufacturing) • Energy Efficiency and CO2 Reduction megatrends.The project aims to achieve the...
Programme: H2020-EU.2.1.1.7.
Record Number: 197508
Last updated on: 2017-01-26
12 > 
List retrieved on: 2017-02-22