Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Content type

Project (17)

Advanced search

Search projects and results

Results 1 - 10 of 17
Results/page:
12 > 
Advanced Distributed Pilot Line for More-than-Moore Technologies
ID: 661796
Start date: 2015-05-01, End date: 2019-04-30
The “Advanced Distributed Pilot Line for More-than-Moore Technologies” project (ADMONT) is focused on a powerful and versatile More-than-Moore (MtM) pilot line for Europe increasing the diversification of CMOS process technologies. The combination of existing expertise...
Programme: H2020-EU.2.1.1.7.
Record Number: 198078
Last updated on: 2017-08-04
Preparing R2 extension to 300mm for BCD Smart Power
ID: 653933
Start date: 2015-07-01, End date: 2018-06-30
R2POWER300 is committed to challenge the following Objectives: • Development and manufacturing of a multi-KET Pilot Line (i.e. Nanoelectronics, Nanotechnology, Advanced Manufacturing) • Energy Efficiency and CO2 Reduction megatrends.The project aims to achieve the...
Programme: H2020-EU.2.1.1.7.
Record Number: 197508
Last updated on: 2017-06-23
An integrated pilot line for micro-fabricated medical devices
ID: 662155
Start date: 2015-06-01, End date: 2018-09-30
The goal of the InForMed project is to establish an integrated pilot line for medical devices. The pilot line includes micro-fabrication, assembly and even the fabrication of smart catheters. The heart of this chain is the micro-fabrication and assembly facility of Philips...
Programme: H2020-EU.2.1.1.7.
Record Number: 198016
Last updated on: 2017-08-23
Which Architecture Yields Two Other Generations Of Fully depleted Advanced Substrate and Technologies
ID: 662175
Start date: 2015-05-01, End date: 2017-12-31
The proposed pilot line project WAYTOGO FAST objective is to leverage Europe leadership in Fully Depleted Silicon on Insulator technology (FDSOI) so as to compete in leading edge technology at node 14nm and beyond preparing as well the following node transistor architecture...
Programme: H2020-EU.2.1.1.7.
Record Number: 197526
Last updated on: 2017-08-23
Cyber Physical System based Proactive Collaborative Maintenance
ID: 662189
Start date: 2015-05-01, End date: 2018-04-30
The overall concept of MANTIS is to provide a proactive maintenance service platform architecture based on Cyber Physical Systems that allows to estimate future performance, to predict and prevent imminent failures and to schedule proactive maintenance. Maintenance is no...
Programme: H2020-EU.2.1.1.7.
Record Number: 198079
Last updated on: 2017-08-04
Integrated Components for Complexity Control in affordable electrified cars
ID: 662192
Start date: 2015-06-01, End date: 2018-05-31
The 3Ccar project will provide highly integrated ECS Components for Complexity Control in thereby affordable electrified cars. The new semiconductors for Complexity management (Control, reduction) will offer the next level of energy efficiency in transportation...
Programme: H2020-EU.2.1.1.7.
Record Number: 197903
Last updated on: 2017-08-04
Robust and Reliable Environment Sensing and Situation Prediction for Advanced Driver Assistance Systems and Automated Driving
ID: 661933
Start date: 2015-06-01, End date: 2018-05-31
Today’s driver assistance systems offer comfort and safety in sound environmental conditions. However, in harsh environment conditions – when needed most – systems stop working due to reduced sensor information quality. Targeting to the area of highly automated driving...
Programme: H2020-EU.2.1.1.7.
Record Number: 197520
Last updated on: 2017-08-04
Electronics and ICT as enabler for digital industry and optimized supply chain management covering the entire product lifecycle
ID: 737459
Start date: 2017-05-01, End date: 2020-04-30
PRODUCTIVE4.0 - AMBITIOUS PROJECT WITH A UNIQUE MAIN OBJECTIVEThe main objective of Productive4.0 is to achieve improvement of digitising the European industry by electronics and ICT. Ultimately, the project aims at suitability for everyday application across all industrial...
Programme: H2020-EU.2.1.1.7.
Record Number: 210800
Last updated on: 2017-08-22
Secure COnnected Trustable Things
ID: 737422
Start date: 2017-05-01, End date: 2020-06-30
Creating trust in wireless solutions and increasing social acceptance are major challenges to achieve the full potential of the Internet of Things. SCOTT, with 57 key partners from 12 countries (EU + Brazil), will provide efficient solutions of wireless, end-to-end secure...
Programme: H2020-EU.2.1.1.7.
Record Number: 210798
Last updated on: 2017-08-22
MegaModelling at Runtime - scalable model-based framework for continuous development andruntime validation of complex systems.
ID: 737494
Start date: 2017-04-01, End date: 2020-03-31
European industry faces stiff competition on the global arena. Electronic Components and Systems become more and morecomplex, thus calling for modern engineering practices to be applied in order to better tackle both productivity and quality.Model-based technologies promise...
Programme: H2020-EU.2.1.1.7.
Record Number: 210528
Last updated on: 2017-08-22
12 > 
List retrieved on: 2017-12-16
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top