Results 1 - 10 of 39
BI-DSC project demonstrated the upscaling of the laser-sealing technology for assembling modules 30 × 30 cm2 with four DSCs cells of 15 × 15 cm2. For that a Laser Sealing Station is completely automatized and the following sealing processes are already optimized: 15 x 15 cm2...
Programme: FP7-IDEAS-ERC
Record Number: 178399
Last updated on: 2016-05-04
[REPORT SUMMARY] Final Report Summary - INVISIBLE (Advanced Amorphous Multicomponent Oxides for Transparent Electronics)
Transparent electronics is today one of the most advanced topics for a wide range of device applications, where the key component are wide band gap semiconductors, where oxides of different origin play an important role, not only as passive component but also as an active...
Programme: FP7-IDEAS-ERC
Record Number: 178731
Last updated on: 2016-03-18
ComplexiTE ultimate goal is to define a multiparametric methodology that allows the screening of biomaterials, cells and culture conditions to define the ideal ones to obtain a bona fide bone tissue-like structure. Bone tissue formation requires an orquestrated interaction...
Programme: FP7-IDEAS-ERC
Record Number: 183523
Last updated on: 2016-06-06
Rail infrastructure managers have been showing strong interest in the development of novel techniques for the reliable and accurate evaluation of rails and faster inspection operations which will lead to the improvement of the efficiency of preventative...
Programme: FP7-TRANSPORT
Record Number: 59251
Last updated on: 2014-07-18
[PROJECT] MUSEUMS - Museums Energy Efficiency & Sustainability In Retrofitted & New Museum Buildings
ID: NNE5/20/1999
Start date: 2000-01-01, End date: 2003-12-31
- Bringing together nine different innovative retrofitting or new museum projects from all over Europe and representing a variety of types with the support of internationally acclaimed experts in the field of energy efficiency research in order to produce excellent showcases ...
Programme: FP5-EESD
Record Number: 57525
Last updated on: 2003-09-05
[PROJECT] COOLHOUSE - Coolhouse-Cooling Houses In Southern Europe Using Innovative Ventilation Strategies
ID: NNE5/193/1999
Start date: 2000-01-01, End date: 2003-12-31
The principal objectives are:
1. To provide proof that alternatives to air conditioning in domestic buildings exist, are practical and provide internal comfort conditions comparable to air conditioned buildings;
2. Provide economic arguments to justify the cost of such systems...
Programme: FP5-EESD
Record Number: 57519
Last updated on: 2003-09-05
ID: JOE3950019
Start date: 1996-01-01, End date: 1997-06-30
Objectives
The objective of the present project is to advance development work on a porous medium burner with an integrated heat exchanger. This burner does not work as a catalytic combustor, but burns with flames within the pores of a porous medium. Combustion in porous m...
Programme: FP4-NNE-JOULE C
Record Number: 37099
Last updated on: 1996-04-01
[PROJECT] BRUNDTLAND - Brundtland City Network
ID: NNE5/72/1999
Start date: 2000-03-01, End date: 2002-08-31
The aim is to develop a network of energy conservation and renewable energy towns - the Brundtland City Network (BCN). The background is the UN-report "our Common Future "with the main author Gro Harlem Brundtland. The UN-report recommended a 50% cut down in the energy consump...
Programme: FP5-EESD
Record Number: 57726
Last updated on: 2003-09-05
[PROJECT] Porto Power Tech'2001
ID: HPCF-CT-2001-00413-01
Start date: 2001-09-08, End date: 2001-09-12
Power Tech is the acronym for a series of prestigious conferences in the Electric Power System field, held in Europe, and co-organized by the IEEE (Institute of Electrical and Electronic Engineers). The Porto Power Tech conference continues the tradition of the previous Power ...
Programme: FP5-HUMAN POTENTIAL
Record Number: 63798
Last updated on: 2002-11-05
[PROJECT] COMBO - Development of Low Emissions Condensing Tele-controlled 400-4000 Kw Gas-fired Water Boiler Systems (combo)
ID: NNE5/246/2001
Start date: 2002-03-01, End date: 2005-02-28
To develop pre-prototypes of gas fired heating boiler systems in the power range from 400 kW to 4 MW, which have a thermal efficiency of 95% ghv and emit less than 20mg/kWh NOx. The systems consist of a cascade of 400 kW-modules and have a tele-control system via Internet or G...
Programme: FP5-EESD
Record Number: 61350
Last updated on: 2003-09-05
List retrieved on: 2017-07-28