[REPORT SUMMARY] Final Report Summary - GREENEST (Gas turbine combustion with Reduced EmissioNs Employing extreme STeam injection)
The increasing use of renewable energy sources also increases the demand for highly flexible and efficient fossil fuel power plants. Gas turbines will play a major role in the future energy supply, as they provide excellent abilities to complement the renewables. Ultra-wet...
Programme: FP7-IDEAS-ERC
Record Number: 197639
Last updated on: 2017-05-10
The issues society is dealing with at the moment, such as development of adaptive strategies to climate change and increasing environmental pressures as well as developing sustainable protective measures against various natural hazards (floods, tsunamis...
Programme: FP7-INFRASTRUCTURES
Record Number: 164265
Last updated on: 2015-05-20
The goal of this project is to create a spaser (or plasmonic laser). By adding sufficient gain to a plasmonic resonator, such a device can generate coherent surface plasmons on a metallic structure, providing an extremely versatile nanoscale source of surface plasmons...
Programme: FP7-IDEAS-ERC
Record Number: 197620
Last updated on: 2017-05-15
[REPORT SUMMARY] Mid-Term Report Summary - NEWTURB (New eddy-simulation concepts and methodologies for frontier problems in Turbulence)
NewTURB is a laboratory in-silico aimed to disentangle and model turbulence by changing the nature of the non-linear terms of Navier-Stokes equations, aspects otherwise inaccessible by using conventional experimental and numerical methods. We have used novel approaches based...
Programme: FP7-IDEAS-ERC
Record Number: 195453
Last updated on: 2017-03-13
[REPORT SUMMARY] Mid-Term Report Summary - MECHMAM (Multiscale Extended Computational Homogenization for the Mechanical design of Advanced Materials)
The project MECHMAM addresses a fundamental challenge in bridging scales in the mechanics of engineering materials, requiring a breakthrough in lifting the existing limits in terms of scale separation. The projects targets a novel extended multiscale homogenization framework...
Programme: FP7-IDEAS-ERC
Record Number: 197622
Last updated on: 2017-05-15
[RESULT IN BRIEF] New technology for the concrete industry
Concrete construction is expensive — mostly because of the formwork, which can be up to 75 % of the costs. This project developed an industrialised process for producing unique, tailor-made concrete structures using a new and cost-effective approach.
Programme: FP7-NMP
Record Number: 155859
Last updated on: 2015-02-10
[RESULT IN BRIEF] Una nuova tecnologia per l’industria del calcestruzzo
Le costruzioni in calcestruzzo sono costose, principalmente a causa della cassaforma, che può rappresentare fino al 75 % delle spese. Questo progetto ha sviluppato un processo industrializzato per produrre strutture in calcestruzzo uniche e su misura usando un nuovo metodo più conveniente.
Programme: FP7-NMP
Record Number: 155859
Last updated on: 2015-02-10
ComplexiTE ultimate goal is to define a multiparametric methodology that allows the screening of biomaterials, cells and culture conditions to define the ideal ones to obtain a bona fide bone tissue-like structure. Bone tissue formation requires an orquestrated interaction...
Programme: FP7-IDEAS-ERC
Record Number: 183523
Last updated on: 2016-06-06
[RESULT IN BRIEF] Una nueva tecnología revoluciona la industria del hormigón
La construcción de estructuras de hormigón es costosa, principalmente debido a la fase de encofrado, que puede representar el 75 % del coste. En el marco de este proyecto se desarrolló un nuevo sistema de producción industrial a medida que permite construir estructuras de hormigón únicas a bajo coste.
Programme: FP7-NMP
Record Number: 155859
Last updated on: 2015-02-10
[RESULT IN BRIEF] Nowa technologia dla przemysłu betoniarskiego
Budowanie z betonu jest kosztowne przede wszystkim za sprawą kosztów przygotowania szalunków, które mogą stanowić nawet 75% łącznego kosztu. W ramach projektu opracowano przemysłowy proces produkcji wyjątkowych, indywidualnie zaprojektowanych konstrukcji betonowych z wykorzystaniem nowego, opłacalnego podejścia.
Programme: FP7-NMP
Record Number: 155859
Last updated on: 2015-02-10
List retrieved on: 2017-07-28