Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Programme

FP5
All
FP5-EESD (3542)
Other
All
FP4-FAIR (14)
FP4-INCO (16)
FP4-NNE-JOULE C (384)
FP4-NNE-THERMIE C (164)

Content type

Project (1347)
Result in Brief (2904)
Report Summary (1045)

Country

Albania (1)
Algeria (4)
Australia (12)
Austria (383)
Belarus (2)
Belgium (396)
Bosnia and Herzegovina (1)
Brazil (3)
Bulgaria (42)
Cameroon (1)
Canada (8)
Chile (1)
China (4)
Croatia (9)
Cyprus (34)
Czech Republic (65)
Denmark (410)
Egypt (9)
Estonia (26)
Finland (216)
France (1095)
Germany (1733)
Greece (492)
Hong Kong (1)
Hungary (60)
Iceland (45)
India (2)
Ireland (125)
Israel (76)
Italy (707)
Japan (2)
Jordan (4)
Kazakhstan (1)
Kyrgyzstan (1)
Latvia (16)
Lebanon (4)
Libya (2)
Liechtenstein (5)
Lithuania (40)
Luxembourg (22)
Mali (1)
Malta (6)
Mexico (1)
Morocco (14)
Mozambique (1)
Netherlands (869)
Nigeria (1)
Norway (234)
Palestine (5)
Philippines (1)
Poland (154)
Portugal (241)
Romania (59)
Russia (16)
Saudi Arabia (2)
Senegal (1)
Serbia (6)
Sierra Leone (2)
Singapore (1)
Slovakia (34)
Slovenia (62)
South Africa (7)
South Korea (1)
Spain (789)
Sweden (410)
Switzerland (230)
Syria (5)
Tanzania (1)
Tunisia (11)
Turkey (22)
Ukraine (8)
United Arab Emirates (1)
United Kingdom (862)
United States (23)
Uzbekistan (1)

Advanced search

Search projects and results

Results 1 - 10 of 5296
Results/page:
12 3 4 5 6 7 8 9 10 > >| 
Improved and eNhanced  Stakeholders Participation In Reinforcement of Electricity Grid
ID: 608472
Start date: 2013-10-01, End date: 2017-01-31
The basic assumption of the project is that the difficult public acceptance of Electric Power System (EPS) infrastructures are due to several reasons: i) the lack of trustworthiness in the relationship between Transmission System Operators (TSOs) and the stakeholders and gene...
Programme: FP7-ENERGY
Record Number: 109369
Last updated on: 2017-09-24
Final Report Summary - INSPIRE-GRID (Improved and eNhanced  Stakeholders Participation In Reinforcement of Electricity Grid)
The INSPIRE-Grid project is aimed at enhancing stakeholders’ participation in the development of future grid infrastructures. INSPIRE-Grid aims to increase stakeholders’ engagement in grid expansion projects, better manage conflicts, and speed up the permitting process. By...
Programme: FP7-ENERGY
Record Number: 199832
Last updated on: 2017-06-21
Wie mehr Unterstützung für neue Stromleitungen gewonnen werden kann
Die Miteinbeziehung der hiesigen Anwohner und Behörden ist laut EU-Forschern ein geeignetes Mittel, um den Bau neuer Stromleitungen zu vereinfachen und das europäische Stromnetz effizienter zu gestalten.
Programme: FP7-ENERGY
Record Number: 201296
Last updated on: 2017-07-07
Available languages: DE, EN, ES, FR, IT, PL
Cómo aumentar el apoyo a la instalación de nuevos tendidos eléctricos
Involucrar a los habitantes y a las autoridades locales es la forma de facilitar la construcción de nuevos tendidos eléctricos y hacer que la red eléctrica de Europa sea más eficiente; en esos términos se manifiestan los investigadores de la Unión Europea.
Programme: FP7-ENERGY
Record Number: 201296
Last updated on: 2017-07-07
Available languages: DE, EN, ES, FR, IT, PL
How to increase support for new power lines
Involving local residents and authorities is the way to facilitate building new power lines and make Europe’s electricity grid more efficient, say EU researchers.
Programme: FP7-ENERGY
Record Number: 201296
Last updated on: 2017-07-07
Available languages: DE, EN, ES, FR, IT, PL
Comment renforcer le soutien à la construction de nouvelles lignes électriques
D'après des chercheurs européens, la construction de nouvelles lignes électriques et l'amélioration de l'efficacité du réseau électrique européen exigent l'implication des habitants et des autorités locales.
Programme: FP7-ENERGY
Record Number: 201296
Last updated on: 2017-07-07
Available languages: DE, EN, ES, FR, IT, PL
Jak zwiększyć poparcie dla tworzenia nowych linii zasilania
Pozyskanie zaangażowania lokalnych mieszkańców i organów jest nowym sposobem, by usprawnić proces budowania nowych linii napięcia i podnieść wydajność unijnej sieci elektroenergetycznej - twierdzą unijni naukowcy.
Programme: FP7-ENERGY
Record Number: 201296
Last updated on: 2017-07-07
Available languages: DE, EN, ES, FR, IT, PL
Come aumentare il sostegno per nuovi elettrodotti
Ricercatori dell’UE affermano che il coinvolgimento dei residenti e delle autorità locali è il modo giusto per facilitare la costruzione di nuovi elettrodotti e per rendere la rete elettrica europea più efficiente.
Programme: FP7-ENERGY
Record Number: 201296
Last updated on: 2017-07-07
Available languages: DE, EN, ES, FR, IT, PL
Promotion of a new generation of solar thermal systems in the MPC
ID: 32319
Start date: 2006-10-02, End date: 2009-01-01
The Mediterranean Partner Countries (MPC) of the European Union are confronted with a rapidly increasing energy demand in the coming decades resulting from a bundle of demographic, socio-economic and resource related factors. The Mediterranean region has large potential for th...
Programme: FP6-SUSTDEV
Record Number: 90568
Last updated on: 2009-05-05
Large-scale integration of RES-E and co-generation into energy supplies in Associated Candidate Countries
ID: 510325
Start date: 2005-04-15, End date: 2006-07-14
The eight Central European Countries (CEC), which have joined the EU on May, 1st 2004, face particular problems related to large-scale integration of renewable- and co-generation electricity into energy supplies. These problems do not often meet sufficient attention from the E...
Programme: FP6-SUSTDEV
Record Number: 75657
Last updated on: 2009-05-15
12 3 4 5 6 7 8 9 10 > >| 
List retrieved on: 2017-09-27
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top