Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Content type

Project (157)
Report Summary (32)

Advanced search

Search projects and results

Results 1 - 10 of 189
Results/page:
12 3 4 5 6 7 8 9 10 > >| 
Passive and Active Systems on Severe Accident source term Mitigation
ID: 323217
Start date: 2013-01-01, End date: 2016-12-31
In case of a severe accident in a Nuclear Power Plant (NPP) fission products are released from the degraded fuel and might reach the environment if their confinement is lost and/or bypassed. Given the high radio-toxic nature of fission products for environment and population,...
Programme: FP7-EURATOM-FISSION
Record Number: 106448
Last updated on: 2017-02-21
Network to review natural analogue studies and their applications to repository safety assessment and public communication
ID: FIKW-CT-2002-20204
Start date: 2003-01-01, End date: 2004-12-31
The aim of this project is to promote a more considered use of natural analogues in safety assessment and public communication. This will be achieved by a critical review of traditional analogue studies, such as investigations of radionuclide transport around uranium ore bodie...
Programme: FP5-EAECTP C
Record Number: 67692
Last updated on: 2003-04-01
Gene radiation interaction: their influence on pre-menopausal breast cancer risk after chernobyl
ID: FIGH-CT-2002-00215
Start date: 2003-01-01, End date: 2004-12-31
The overall objective of this proposal is to examine the aetiology of pre-menopausal breast cancer after the Chernobyl accident. Specific objectives are to evaluate the role of radiation and genetic modifiers in increases in breast cancer incidence in Belarus and Ukraine and t...
Programme: FP5-EAECTP C
Record Number: 67219
Last updated on: 2003-04-01
Thermal fatigue evaluation of piping system
ID: FIKS-CT-2001-00158
Start date: 2001-12-01, End date: 2004-11-30
Thermal fatigue is a recurring problem when LWR plants become older and life time extension activities are initiated. In general, the common thermal fatigue issues are understood and can be controlled by plant instrumentation systems. However, the Civaux 1 and other incidents ...
Programme: FP5-EAECTP C
Record Number: 59924
Last updated on: 2003-04-01
Integrity evaluation
[REPORT SUMMARY] Integrity evaluation
The "integrity evaluation" is based on the thermal spectrum loads determined by the experimental and numerical results deduced in THERFAT. Different integrity evaluation procedures concerning the assessment of stresses, fatigue usage, crack initiation and crack propagation iss...
Programme: FP5-EAECTP C
Record Number: 44278
Last updated on: 2007-06-18
Information Requirements and Countermeasure Evaluation Techniques in Nuclear Emergency Management
ID: FIKR-CT-2001-00193
Start date: 2001-12-01, End date: 2004-11-30
The project enhances coherence of response to nuclear emergencies in Europe by improving the decision support methods and models in ways that take into account the needs and concerns of different parties involved. Evaluation subsystems are developed and included in RODOS and A...
Programme: FP5-EAECTP C
Record Number: 59921
Last updated on: 2004-08-25
Evatech seminar on facilitated workshops
According to the Description of Work of the EVATECH project a training seminar on facilitated workshops was arranged at STUK in 12-14 May 2003. Objective of the seminar was to train persons to facilitate workshops to be arranged in all the seven countries participating in the ...
Programme: FP5-EAECTP C
Record Number: 40235
Last updated on: 2006-07-03
Information package for facilitated workshops
Within the EVATECH project of the 5th framework programme of the European Commission facilitated workshops are planned in a number of European countries to study the applicability of the workshop method and to learn about the practical needs of stakeholders. The intention is t...
Programme: FP5-EAECTP C
Record Number: 40249
Last updated on: 2006-07-03
Training material for conduction of the facilitated workshops
In EVATECH project a training seminar on facilitated workshop was arranged at STUK in May 2003. The aim of the seminar was to train participants how to organise and facilitate a workshop supported by decision analysis methods. The seminar comprised of main principles in off-si...
Programme: FP5-EAECTP C
Record Number: 40240
Last updated on: 2006-07-03
Facilitated workshops: planning of countermeasures in a case of nuclear accident
Different persons and organisations are responsible for planning, decision-making and implementation of countermeasures in various phases of an accident. At the accident site the operator or licensee is, in general, responsible for controlling the event, and, in many cases, al...
Programme: FP5-EAECTP C
Record Number: 40246
Last updated on: 2006-07-03
12 3 4 5 6 7 8 9 10 > >| 
List retrieved on: 2017-08-02
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top