Servizio Comunitario di Informazione in materia di Ricerca e Sviluppo - CORDIS

Le informazioni sui progetti di Orizzonte 2020 e ora anche le relative sintesi delle relazioni sono disponibili su CORDIS. Tutti i progetti H2020 possono essere scaricati dal Portale Open Data dell'UE .

My refinements


Download results of this page


Perfeziona per:

Tipo di contenuto

Progetto (199)

Paese

Belgio (3)
Danimarca (9)
Francia (61)
Germania (25)
Grecia (2)
Irlanda (6)
Italia (17)
Paesi Bassi (11)
Portogallo (3)
Regno Unito (59)
Spagna (3)

Advanced search

Cerca progetti e risultati

Results 1 - 10 of 199
Results/page:
12 3 4 5 6 7 8 9 10 > >| 
ID: TH./06037/87
Data di inizio: 1988-07-01, Termine: 1991-06-30
A failure of an anchor chain mooring a floating production system could cause the loss of the vessel, with loss of life, environmental pollution, and an interruption in the supply of hydrocarbons. A similar mooring failure affecting a heavy lift vessel working in close proximi...
Programme: ENG-HYDROCARB 2C
Record Number: 15242
Last updated on: 1998-08-04
ID: TH./01065/86
Data di inizio: 1986-04-01, Termine: 1989-06-30
Seismic methods are worldwide the most sophisticated tools in geophysicals exploration of mineral resources. By these methods, the stratigraphy of the subsurface is discovered commonly by use of the material specific travel times of the reflected seismic waves . It is will kno...
Programme: ENG-HYDROCARB 2C
Record Number: 14869
Last updated on: 1998-08-04
[PROGETTO] VOYAGEUR
ID: TH./10056/86
Data di inizio: 1986-04-03, Termine: 1989-06-30
Design, build and test a pipeline inspection device (pig) based on new instrumental concepts; this "pig" will perform traditionnal internal inspection (gauging/calipering) and also gather all necessary "navigation" data to compute and draw: - the pipe path or trajectory - the ...
Programme: ENG-HYDROCARB 2C
Record Number: 15303
Last updated on: 1998-08-04
ID: TH./01113/87
Data di inizio: 1988-02-01, Termine: 1989-12-31
It is well known that vertical seismic profiles (VSP) are useful tools for predicting lithology ahead of the drill bit. The goal of the research is to verify whether the seismic waves, both P ad S, generated by the bit during drilling, could be utilized to generate a reciproca...
Programme: ENG-HYDROCARB 2C
Record Number: 14891
Last updated on: 1998-08-04
ID: TH./15106/87
Data di inizio: 1988-03-01, Termine: 1988-12-31
The oil industry presently bases their intervention scenarios on modified and adapted maintenance methods developed for onshore or shallow water intervention which seldom show optimum and economic solutions. To increase efficiency and economy for deepwater intervention new met...
Programme: ENG-HYDROCARB 2C
Record Number: 15354
Last updated on: 1998-08-04
ID: TH./03305/89
Data di inizio: 1989-08-01, Termine: 1991-06-30
The aim of PLATINE project is to specify a central production platform, unmanned, teleoperated from a remote control room, with a limited number of visits for inspection and overhauling. The intermediate aims consist in working out and testing pilot units related to sub-system...
Programme: ENG-HYDROCARB 2C
Record Number: 15194
Last updated on: 1998-08-04
ID: TH./03306/89
Data di inizio: 1990-01-01, Termine: 1992-12-31
Increasing the lifetime of bottomhole equipment used for drilling or completion of wells constitutes a very important objective within the oil industry, as it may imply a significant cost reduction, regarding both the drilling phase and the completion phase during the life of ...
Programme: ENG-HYDROCARB 2C
Record Number: 15195
Last updated on: 1998-08-04
ID: TH./01108/87
Data di inizio: 1988-03-01, Termine: 1990-04-01
The aim of the project is to make an improved model for phase equilibrium calculations on gas condensate mixtures. The need arises because an increasing part of the hydrocarbon production in the North Sea comes from gas condensate fields. The phase behaviour of a gas condensat...
Programme: ENG-HYDROCARB 2C
Record Number: 14888
Last updated on: 1998-08-04
ID: TH./15105/87
Data di inizio: 1988-04-01, Termine: 1990-04-01
The objective of this project is to improve a water injection system (SPOOL) fitted on a gas well to extinguish a fire after an accidental eruption on a drilling platform. This process has been developed by BERTIN and is fully successful for fire without structure above the ga...
Programme: ENG-HYDROCARB 2C
Record Number: 15353
Last updated on: 1998-08-04
ID: TH./03297/88
Data di inizio: 1989-01-16, Termine: 1990-06-30
General. The purpose of the project is to demonstrate the feasibility of a three-legged platform with suction pile foundation. The piles will be an integrated part of the structure. In particular, the possible utilization of the suction effect arising when a closed-top pile is...
Programme: ENG-HYDROCARB 2C
Record Number: 15191
Last updated on: 1998-08-04
12 3 4 5 6 7 8 9 10 > >| 
List retrieved on: 2017-09-23