Abstract

The 1 MWe demonstration Solar Power Plant was designed and constructed in the frame of the EEC Contract No 238-77-ESC ended on 5th January 1981; the purpose of the present contract was the following: + train the operation team in the operating procedures + bring up the plant to full power and obtain a record of this work based on measurement of the main operating parameters + improve operating procedures, increase plant automation, evaluate plant behaviour and gain experience of operation of the plant as such and in connection to the grid.

Additional information

Authors: PALZ W CEC BRUXELLES (BELGIUM), CEC BRUXELLES (BELGIUM)
Bibliographic Reference: EUR 9374 EN (1985) FS, 333 P., BFR 1100, EUROFFICE, LUXEMBOURG, POB 1003
Availability: Can be ordered online
Record Number: 1989124047100 / Last updated on: 1987-01-01
Category: PUBLICATION
Available languages: en