Community Research and Development Information Service - CORDIS

Abstract

The first JET neutral injection beamline system has been installed. Many of the components have numerous vacuum brazed, electron beam welded and friction welded joints including various dissimilar alloy combinations. The large beamline system has been assembled, installed and aligned to tight tolerances. Acceptance leak testing of components has included thermal cycling from ambient temperature to 300 degrees C followed by pressurization with helium inside a vacuum furnace. Installation of the large components has required special lifting and alignment equipment.

Additional information

Authors: HAANGE R, JET JOINT UNDERTAKING, ABINGDON (UK);ALTMANN H, JET JOINT UNDERTAKING, ABINGDON (UK);PAPASTERGIOU S, JET JOINT UNDERTAKING, ABINGDON (UK);TIVEY R B, JET JOINT UNDERTAKING, ABINGDON (UK);WATSON M J JET JOINT UNDERTAKING, ABINGDON (UK), JET JOINT UNDERTAKING, ABINGDON (UK)
Bibliographic Reference: 11TH SYMPOSIUM ON FUSION ENGINEERING, AUSTIN, TEXAS (USA), NOV. 18-22, 1985 PP. 8-1 - 8-6, WRITE TO THE PUBLICATIONS OFFICER, JET JOINT UNDERTAKING, ABINGDON, OXON OX14 3EA (UK), MENTIONING REPORT JET-P(85)26, 1985
Record Number: 1989125076100 / Last updated on: 1987-12-01
Category: PUBLICATION
Available languages: en