  • DESIGN, COMMISSIONING AND EARLY OPERATION OF THE POWER SUPPLY AND PROTECTION SYSTEM FOR THE EXTRACTION GRID OF THE JET NEUTRAL INJECTORS AT 160 KV

Abstract

The paper describes the design concept, the commissioning and the early operation of the power supply and protection system for the extraction grid of the JET neutral injectors, to produce deuterium beams at 160kV. While the design concept was proposed in 1977, the detailed design was performed in 1982, commissioning took place in 1985 and operation, in a Testbed, started in 1986.

Additional information

Authors: MONDINO P L, JET JOINT UNDERTAKING, ABINGDON (UK);SIEMENS, ERLANGEN (GERMANY);CLAESEN R, JET JOINT UNDERTAKING, ABINGDON (UK);SIEMENS, ERLANGEN (GERMANY);DOBBING J A, JET JOINT UNDERTAKING, ABINGDON (UK);SIEMENS, ERLANGEN (GERMANY);BAIGGER P A JET JOINT UNDERTAKING, ABINGDON (UK), JET JOINT UNDERTAKING, ABINGDON (UK);SIEMENS, ERLANGEN (GERMANY);SIEMENS, ERLANGEN (GERMANY), JET JOINT UNDERTAKING, ABINGDON (UK);SIEMENS, ERLANGEN (GERMANY)
Bibliographic Reference: 14TH SOFT CONFERENCE, AVIGNON (FRANCE), SEPT. 8-12, 1986 VOL. 1, PP. 933-939 1895 P., 1986, VOL. 1 AND VOL. 2, ISBN 0 08 034935 8 WRITE TO PERGAMON PRESS, HEADINGTON HILL HALL, OXFORD, OX3 0BW (UK), PRICE: UKL 220 (FOR BOTH VOLS.)
Record Number: 1989126042601 / Last updated on: 1989-01-01