Community Research and Development Information Service - CORDIS

Abstract

The results of calculations relating to the TF magnet were summarised for the first time for the Phase II application, which was made in 1984. Additions made since that date are interpreted together for the operation of ASDEX Upgrade, and possible problems are considered. The calculations have been supplemented with material and component studies from the outset. The report does not go into detail on the tests but rather tries to sift out useful results.

Additional information

Authors: STREIBL B, MAX-PLANCK-INSTITUT FUER PLASMAPHYSIK, GARCHING BEI MUENCHEN (DE);MUKHERJEE S MAX-PLANCK-INSTITUT FUER PLASMAPHYSIK, GARCHING BEI MUENCHEN (DE), MAX-PLANCK-INSTITUT FUER PLASMAPHYSIK, GARCHING BEI MUENCHEN (DE)
Bibliographic Reference: REPORT: IPP 1/250 DE (1989) AVAILABLE FROM MAX-PLANCK-INSTITUT FUER PLASMAPHYSIK, 8046 GARCHING BEI MUENCHEN (DE)
Record Number: 1989128066400 / Last updated on: 1990-11-09
Category: PUBLICATION
Available languages: de